---
description: Is Papillion a good data center market for power? DCPI verdict BUILD, score 67.9/100 (SPP), as of 2026-11-12. 100 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Papillion data centers: power, grid and capacity | DC Hub"
---

# Papillion data center market

Power availability in Papillion: DCPI verdict BUILD, composite score 67.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 210 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Papillion data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Papillion market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**67.9/100**

MW, all listings**100**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## PAPILLION at a glance

PAPILLION has 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (100 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 100 |
| Total listed | 100 |

## Developers building or planning in PAPILLION

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Google | 100 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in PAPILLION

DC Hub does not hold a lease-rate figure for this market yet.

Papillion operates with meaningful power availability relative to current demand. Twelve tracked facilities are live in the market, though only one operator publicly discloses megawatt capacity; operators include Fireball Group LLC Data Center, Google, LightEdge Data Center, LightEdge Solutions, and Midlands Data Center, each maintaining single-site presence in the tracked base.

The DCPI verdict signals that new power procurement is feasible here. Together, these metrics suggest that operators and builders can source additional power without competing against severe scarcity conditions or absorbing prohibitive grid access costs.

No recent deals have been tracked in Papillion, so current deal flow remains opaque. The absence of announced transactions does not signal weak fundamentals or operator reluctance; rather, it reflects the typical market condition where deal announcements cluster unpredictably and depend on announcement cadence and disclosure thresholds. With five distinct operators already active—none dominant—the market shows baseline fragmentation typical of mid-tier data center regions.

## Data centers in PAPILLION

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Papillion Building 2](https://dchub.cloud/facilities/google-google-papillion-building-2-2e3d7a95) | Google | Under Construction | 100 |
| [FIREBALL GROUP LLC DATA CENTER](https://dchub.cloud/facilities/fireball-group-llc-data-center-0f86db33) |  |  |  |
| [LIGHTEDGE DATA CENTER](https://dchub.cloud/facilities/lightedge-data-center-c86def4b) |  |  |  |
| [LightEdge Omaha (OMA1)](https://dchub.cloud/facilities/lightedge-solutions-lightedge-omaha-oma1-5563097b) | LightEdge Solutions | Operational |  |
| [MIDLANDS DATA CENTER](https://dchub.cloud/facilities/midlands-data-center-14d2c7be) |  |  |  |
| [PAPILLION 5 MW DATA CENTER](https://dchub.cloud/facilities/papillion-5-mw-data-center-8eb93d06) |  |  |  |
| [TierPoint Omaha - Midlands](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-omaha-midlands-f4a7479c) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Nebraska](https://dchub.cloud/facilities/in/us/nebraska).

## More on PAPILLION

- [PAPILLION DCPI score](https://dchub.cloud/dcpi/papillion)
- [PAPILLION market brief](https://dchub.cloud/markets/papillion/brief)
- [Nebraska data center market brief](https://dchub.cloud/states/nebraska/brief)
- [Nebraska data center tax incentives](https://dchub.cloud/states/nebraska/data-center-incentives)

### Email me when the PAPILLION DCPI verdict changes

Email me when PAPILLION's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

PAPILLION: 100 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=papillion) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=papillion)

JSON: [/api/v1/markets/papillion/deep-dive](https://dchub.cloud/api/v1/markets/papillion/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Papillion","item":"https://dchub.cloud/markets/papillion"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Papillion Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:29.336170+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/papillion",
 "wordCount":210,
 "about":{"@type":"Place","name":"Papillion"},
 "description":"Live data-center market analysis. DCPI score 67.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "papillion", "name": "PAPILLION Data Center Market — DC Hub", "description": "Live data-center market measurements for PAPILLION, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/papillion", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "PAPILLION"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 100.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 67.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:45."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/papillion#webpage", "url": "https://dchub.cloud/markets/papillion", "name": "Papillion data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Papillion data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Papillion market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Papillion data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Papillion market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
