---
description: Is Overland Park a good data center market for power? DCPI verdict BUILD, score 66.6/100 (SPP), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Overland Park data centers: power, grid and capacity | DC Hub"
---

# Overland Park data center market

Power availability in Overland Park: DCPI verdict BUILD, composite score 66.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 279 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Overland Park data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Overland Park market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**66.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**BUILD**

## Colocation lease rates in Overland Park

DC Hub does not hold a lease-rate figure for this market yet.

Overland Park currently operates four tracked facilities across a fragmented operator base. DataBank, QTS, QTS Realty Trust, Inc., and WANSecurity, Inc. each maintain a single facility in the market. No recent deal activity has been recorded in Overland Park's tracked data.

The DCPI verdict of BUILD reflects power-favorable conditions for new capacity deployment.

Operator presence remains distributed with no single player holding dominant market position. DataBank's single-facility footprint aligns with its regional acquisition strategy evident elsewhere in the broader Kansas City metro area. QTS maintains dual branding through both its direct entity and its parent, QTS Realty Trust, Inc., a standard holding structure for publicly traded data center REITs. The presence of WANSecurity, Inc. indicates market entry by smaller or specialized operators. The absence of recent deal flow means no M&A announcements, expansions, or capacity transactions have moved through public tracking in the near term.

## Data centers in Overland Park

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DataBank Kansas City (MCI2)](https://dchub.cloud/facilities/databank-databank-kansas-city-mci2-8020f541) | DataBank | Operational |  |
| [QTS Overland Park (OVP1)](https://dchub.cloud/facilities/qts-qts-overland-park-ovp1-5391ca3f) | QTS | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Kansas](https://dchub.cloud/facilities/in/us/kansas).

## More on Overland Park

- [Overland Park DCPI score](https://dchub.cloud/dcpi/overland-park)
- [Overland Park market brief](https://dchub.cloud/markets/overland-park/brief)
- [Kansas data center market brief](https://dchub.cloud/states/kansas/brief)
- [Kansas data center tax incentives](https://dchub.cloud/states/kansas/data-center-incentives)

### Email me when the Overland Park DCPI verdict changes

Email me when Overland Park's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Overland Park market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=overland-park) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=overland-park)

JSON: [/api/v1/markets/overland-park/deep-dive](https://dchub.cloud/api/v1/markets/overland-park/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Overland Park","item":"https://dchub.cloud/markets/overland-park"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Overland Park Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:21.381932+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/overland-park",
 "wordCount":279,
 "about":{"@type":"Place","name":"Overland Park"},
 "description":"Live data-center market analysis. DCPI score 66.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "overland-park", "name": "Overland Park Data Center Market — DC Hub", "description": "Live data-center market measurements for Overland Park, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/overland-park", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Overland Park"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 66.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:51."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:51.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:51."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/overland-park#webpage", "url": "https://dchub.cloud/markets/overland-park", "name": "Overland Park data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Overland Park data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Overland Park market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Overland Park data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Overland Park market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
