# Oslo data center market

Power availability in Oslo: DCPI verdict AVOID, composite score 30.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 260 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Oslo data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Oslo market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.5/100**

MW, all listings**1**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Oslo

DC Hub does not hold a lease-rate figure for this market yet.

Oslo's tracked facilities number 54 across multiple operators, with one site currently reporting power consumption metrics to the market. GlobalConnect Group and Blix Solutions AS each operate three facilities in the market, while Blix Solutions Oslo, Basefarm AS, and Basefarm Oslo each hold smaller portfolios. The operator base remains relatively fragmented, with no single entity controlling a dominant share of tracked capacity.

Operators seeking new power connections or expansions face structural headwinds on both supply availability and grid infrastructure readiness. This two-sided tightness distinguishes Oslo from markets with asymmetric profiles and makes power procurement planning complex for new entrants or scaling operators.

Recent tracked deal flow in Oslo remains absent, which contrasts with evidence of ongoing project activity in the market. Magnora Data Center has partnered with Blix to operate a 2MW facility and previously occupied space in a converted building formerly used by Bankenes Betalingssentral. These announcements point to gradual facility deployment and capital formation, though they do not show up in the formal deal pipeline tracked here.

## Data centers in Oslo

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Azure Norway East Oslo](https://dchub.cloud/facilities/microsoft-azure-norway-east-oslo-e16f366c) | Microsoft | Operational |  |
| [Blix BDC Oslo](https://dchub.cloud/facilities/blix-solutions-as-blix-bdc-oslo-a74687ae) | Blix Solutions AS | Operational |  |
| [Blix CJH Oslo](https://dchub.cloud/facilities/blix-solutions-as-blix-cjh-oslo-110ee32b) | Blix Solutions AS | Operational |  |
| [Blix NR5 Oslo](https://dchub.cloud/facilities/blix-solutions-as-blix-nr5-oslo-cdcf7978) | Blix Solutions AS | Operational |  |
| [Bulk Data Centers Oslo Internet Exchange](https://dchub.cloud/facilities/bulk-data-centers-oslo-internet-exchange-01d9cf5b) |  | Operational |  |
| [DigiPlex Oslo DC](https://dchub.cloud/facilities/digiplex-digiplex-oslo-dc-7ba3cc85) | DigiPlex | Operational |  |
| [GlobalConnect Nydalen](https://dchub.cloud/facilities/globalconnect-group-globalconnect-nydalen-30079ef8) | GlobalConnect Group | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Norway](https://dchub.cloud/facilities/in/no).

## More on Oslo

- [Oslo DCPI score](https://dchub.cloud/dcpi/oslo)
- [Oslo market brief](https://dchub.cloud/markets/oslo/brief)

### Email me when the Oslo DCPI verdict changes

Email me when Oslo's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Oslo: 1 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=oslo) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=oslo)

JSON: [/api/v1/markets/oslo/deep-dive](https://dchub.cloud/api/v1/markets/oslo/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Oslo","item":"https://dchub.cloud/markets/oslo"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Oslo Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:17:07.256363+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/oslo",
 "wordCount":260,
 "about":{"@type":"Place","name":"Oslo"},
 "description":"Live data-center market analysis. DCPI score 30.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "oslo", "name": "Oslo Data Center Market — DC Hub", "description": "Live data-center market measurements for Oslo, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/oslo", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Oslo"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:49."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:49.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:49."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/oslo#webpage", "url": "https://dchub.cloud/markets/oslo", "name": "Oslo data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Oslo data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Oslo market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Oslo data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Oslo market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```