---
description: Is Orangeburg a good data center market for power? DCPI verdict CAUTION, score 47.3/100 (NYISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Orangeburg data centers: power, grid and capacity | DC Hub"
---

# Orangeburg data center market

Power availability in Orangeburg: DCPI verdict CAUTION, composite score 47.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 252 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Orangeburg data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Orangeburg market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Orangeburg

DC Hub does not hold a lease-rate figure for this market yet.

Critical Systems Realty holds two sites in the market, while Bloomberg, DataBank, and ColoHouse Premier Datacenter each operate one facility. No capacity figures have been reported by any tracked site, limiting visibility into total installed power or buildout scale. The market's operator footprint remains tightly held among a handful of regional and national players.

The DCPI verdict of CAUTION reflects mixed signals on new power availability. Neither score reaches threshold levels that would fully unlock or completely close the market for power expansion.

Deal flow in Orangeburg is stalled. No recent transactions have been tracked in this market, a pattern consistent with smaller regional data center markets where M&A and site acquisition activity remains dormant. DataBank, one of the four named operators here, has pursued acquisition strategy elsewhere—most recently acquiring an existing data center facility in Eagan—but no comparable activity has surfaced in Orangeburg itself.

## Data centers in Orangeburg

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Bloomberg Data Center](https://dchub.cloud/facilities/bloomberg-bloomberg-data-center-3c4c7738) | Bloomberg | Operational |  |
| [ColoHouse New York](https://dchub.cloud/facilities/colohouse-premier-datacenter-colohouse-new-york-167261bd) | ColoHouse Premier Datacenter | Operational |  |
| [JP Morgan Chase Data Center](https://dchub.cloud/facilities/jp-morgan-chase-jp-morgan-chase-data-center-cb78f3ac) | JP Morgan Chase | Operational |  |
| [NYSE Data Center](https://dchub.cloud/facilities/nyse-nyse-data-center-bd55e2b6) | nyse | Operational |  |
| [ORNY1](https://dchub.cloud/facilities/1547-critical-systems-realty-1547-new-york-f23ef508) | 1547 Critical Systems Realty | Operational |  |
| [fifteenfortyseven CSR ORNY1](https://dchub.cloud/facilities/fifteenfortyseven-critical-systems-realty-fifteenfortyseven-csr-orny1-22e66179) | fifteenfortyseven Critical Systems Realty | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New York](https://dchub.cloud/facilities/in/us/new-york).

## More on Orangeburg

- [Orangeburg DCPI score](https://dchub.cloud/dcpi/orangeburg)
- [Orangeburg market brief](https://dchub.cloud/markets/orangeburg/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Orangeburg DCPI verdict changes

Email me when Orangeburg's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Orangeburg market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=orangeburg) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=orangeburg)

JSON: [/api/v1/markets/orangeburg/deep-dive](https://dchub.cloud/api/v1/markets/orangeburg/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Orangeburg","item":"https://dchub.cloud/markets/orangeburg"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Orangeburg Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:16:17.405136+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/orangeburg",
 "wordCount":252,
 "about":{"@type":"Place","name":"Orangeburg"},
 "description":"Live data-center market analysis. DCPI score 47.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "orangeburg", "name": "Orangeburg Data Center Market — DC Hub", "description": "Live data-center market measurements for Orangeburg, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/orangeburg", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Orangeburg"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:09."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:09.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:09."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/orangeburg#webpage", "url": "https://dchub.cloud/markets/orangeburg", "name": "Orangeburg data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Orangeburg data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Orangeburg market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Orangeburg data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Orangeburg market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
