description: Is Omaha a good data center market for power? DCPI verdict BUILD, score 67.3/100 (SPP), as of 2026-11-12. 856 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Omaha data centers: power, grid and capacity | DC Hub"
---

# Omaha data center market

Power availability in Omaha: DCPI verdict BUILD, composite score 67.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 227 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Omaha data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Omaha market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**67.3/100**

MW, all listings**856**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## OMAHA at a glance

OMAHA has 856 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (850 MW) and LightEdge (6 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 856 |
| Total listed | 856 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in OMAHA

DC Hub does not hold a lease-rate figure for this market yet.

Google operates three sites in the market, while CyrusOne and CenturyLink W Bellevue each maintain single locations. The market shows active expansion momentum, with Google announcing a new northwest Omaha facility as part of its broader Nebraska growth initiative.

The DCPI verdict of BUILD reflects a power environment tilted toward availability.

Deal activity in Omaha remains untracked in recent periods, distinguishing it from markets experiencing active M&A flows. The operator landscape remains concentrated, with Google's three-site presence alongside smaller regional players.

Regulatory attention is intensifying as expansion accelerates, with community forums examining energy and water impacts alongside formal approval processes—the nearby Kearney market approved a 368-megawatt facility, signaling regional appetite for hyperscale infrastructure. Power availability and supply reliability remain the primary technical variables shaping Omaha's near-term development trajectory.

## Data centers in OMAHA

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Cloud us-central1 (Iowa)](https://dchub.cloud/facilities/google-google-cloud-us-central1-iowa-abab4352) | Google | Operational | 500 |
| [Google Council Bluffs Data Center](https://dchub.cloud/facilities/google-google-council-bluffs-data-center-e6a28ba0) | Google | Operational | 350 |
| [LightEdge Omaha](https://dchub.cloud/facilities/lightedge-lightedge-omaha-34a95032) | LightEdge | Operational | 6 |
| [1623 Farnam](https://dchub.cloud/facilities/news-press-gazette-company-1623-farnam-199ff00e) | News-Press & Gazette Company | Operational |  |
| [1623 Farnam - Omaha](https://dchub.cloud/facilities/1623-farnam-llc-1623-farnam-omaha-4bff5776) | 1623 Farnam, LLC | Operational |  |
| [CyrusOne Council Bluffs IA](https://dchub.cloud/facilities/cyrusone-cyrusone-council-bluffs-ia-20595673) | CyrusOne | Operational |  |
| [CyrusOne OCB1 Council Bluffs](https://dchub.cloud/facilities/cyrusone-cyrusone-ocb1-council-bluffs-8d23ad56) | CyrusOne | Operational |  |
| [First National Technical Center](https://dchub.cloud/facilities/first-national-of-nebraska-first-national-technical-center-1e37f2a3) | First National of Nebraska | Operational |  |
| [Google Council Bluffs Iowa](https://dchub.cloud/facilities/google-google-council-bluffs-iowa-4016dad9) | Google | Operational |  |
| [Omaha Switch](https://dchub.cloud/facilities/cogent-communications-omaha-switch-3d21b9df) | Cogent Communications |  |  |
| [Scott Data Center Omaha](https://dchub.cloud/facilities/scott-managed-services-scott-data-center-omaha-d17c9ded) | Scott Managed Services | Operational |  |
| [Union Pacific Jack Koraleski Technology, Research & Development Center](https://dchub.cloud/facilities/union-pacific-railroad-union-pacific-jack-koraleski-technology-research-development-center-ce8e4ff2) | Union Pacific Railroad | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Nebraska](https://dchub.cloud/facilities/in/us/nebraska).

## More on OMAHA

- [OMAHA DCPI score](https://dchub.cloud/dcpi/omaha)
- [OMAHA market brief](https://dchub.cloud/markets/omaha/brief)
- [Nebraska data center market brief](https://dchub.cloud/states/nebraska/brief)
- [Nebraska data center tax incentives](https://dchub.cloud/states/nebraska/data-center-incentives)

### Email me when the OMAHA DCPI verdict changes

Email me when OMAHA's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

OMAHA: 856 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=omaha) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=omaha)

JSON: [/api/v1/markets/omaha/deep-dive](https://dchub.cloud/api/v1/markets/omaha/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Omaha","item":"https://dchub.cloud/markets/omaha"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Omaha Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:16:09.778380+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/omaha",
 "wordCount":227,
 "about":{"@type":"Place","name":"Omaha"},
 "description":"Live data-center market analysis. DCPI score 67.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "omaha", "name": "OMAHA Data Center Market — DC Hub", "description": "Live data-center market measurements for OMAHA, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/omaha", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "OMAHA"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 856.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 67.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:19."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:19.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:19."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/omaha#webpage", "url": "https://dchub.cloud/markets/omaha", "name": "Omaha data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Omaha data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Omaha market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Omaha data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Omaha market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```