# Oak Brook data center market

Power availability in Oak Brook: DCPI verdict AVOID, composite score 20.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 216 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Oak Brook data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Oak Brook market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Oak Brook

DC Hub does not hold a lease-rate figure for this market yet.

Oak Brook operates as a five-facility market with a fragmented operator base spanning Colocation America Corporation, DataBank, New York Internet, Serverfarm, and US Signal. No single operator controls more than one tracked site. The market has not reported tracked MW capacity, limiting visibility into total deployable power density.

Together, these readings suggest that operators entering Oak Brook should expect elevated lead times and costs associated with new power supply, whether through utility interconnect upgrades or distributed generation solutions.

Deal flow in Oak Brook has stalled; no recent transactions are tracked. The five-operator structure indicates ownership is spread, with no dominant player holding consolidation leverage. DataBank, which operates one Oak Brook site, has pursued acquisition strategy in other markets, most recently acquiring an existing Eagan facility; however, no parallel activity is evident in Oak Brook specifically.

Power scarcity in Oak Brook will likely remain a limiting factor for new colocation or hyperscale deployment until grid infrastructure expands.

## Data centers in Oak Brook

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CDC4 - 1808 Swift Dr](https://dchub.cloud/facilities/colocation-america-corporation-cdc4-1808-swift-dr-32252f28) | Colocation America Corporation | Operational |  |
| [DataBank Chicago (ORD4)](https://dchub.cloud/facilities/databank-databank-chicago-ord4-f0ec2920) | DataBank | Operational |  |
| [NYI CH1 (800 Jorie Blvd)](https://dchub.cloud/facilities/new-york-internet-nyi-ch1-800-jorie-blvd-c40aef6c) | New York Internet | Operational |  |
| [Serverfarm CH2 Oak Brook / Chicago](https://dchub.cloud/facilities/serverfarm-serverfarm-ch2-oak-brook-chicago-7e6b35ec) | Serverfarm | Operational |  |
| [US Signal - Oak Brook](https://dchub.cloud/facilities/us-signal-us-signal-oak-brook-4bd848b3) | US Signal | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Illinois](https://dchub.cloud/facilities/in/us/illinois).

## More on Oak Brook

- [Oak Brook DCPI score](https://dchub.cloud/dcpi/oak-brook)
- [Oak Brook market brief](https://dchub.cloud/markets/oak-brook/brief)
- [Illinois data center market brief](https://dchub.cloud/states/illinois/brief)
- [Illinois data center tax incentives](https://dchub.cloud/states/illinois/data-center-incentives)

### Email me when the Oak Brook DCPI verdict changes

Email me when Oak Brook's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Oak Brook market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=oak-brook) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=oak-brook)

JSON: [/api/v1/markets/oak-brook/deep-dive](https://dchub.cloud/api/v1/markets/oak-brook/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Oak Brook","item":"https://dchub.cloud/markets/oak-brook"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Oak Brook Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:15:47.806940+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/oak-brook",
 "wordCount":216,
 "about":{"@type":"Place","name":"Oak Brook"},
 "description":"Live data-center market analysis. DCPI score 20.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "oak-brook", "name": "Oak Brook Data Center Market — DC Hub", "description": "Live data-center market measurements for Oak Brook, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/oak-brook", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Oak Brook"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:22."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:22.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:22."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/oak-brook#webpage", "url": "https://dchub.cloud/markets/oak-brook", "name": "Oak Brook data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Oak Brook data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Oak Brook market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Oak Brook data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Oak Brook market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```