description: Is Northlake a good data center market for power? DCPI verdict AVOID, score 19.9/100 (PJM), as of 2026-11-12. 28 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Northlake data centers: power, grid and capacity | DC Hub"
---

# Northlake data center market

Power availability in Northlake: DCPI verdict AVOID, composite score 19.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 277 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Northlake data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Northlake market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.9/100**

MW, all listings**28**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Northlake at a glance

Northlake has 28 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Aligned (28 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 28 |
| Total listed | 28 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Northlake

DC Hub does not hold a lease-rate figure for this market yet.

One tracked site reports operational megawattage, though aggregate capacity figures are not available across the market. The operator roster reflects regional consolidation, with single-site operators including Ascent, LLC and others alongside the dual-operator presence of Aligned entities and Microsoft's Chicago-based infrastructure.

This combination signals that available grid headroom is limited relative to existing demand, and spare generation capacity within tracked facilities remains modest. Together these readings suggest that securing incremental power supply to support new builds or expansions will face both grid-side and facility-side tightness.

Aligned Data Centers' substantial three-facility presence and Microsoft's two-site footprint represent the dominant infrastructure anchors; no incoming operators or facility acquisitions appear in the current transaction log.

Forward visibility hinges on whether grid upgrades or facility-level power augmentation projects move forward in the near term.

## Data centers in Northlake

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Aligned Chicago](https://dchub.cloud/facilities/aligned-aligned-chicago-84a5e3b6) | Aligned | Operational | 28 |
| [Aligned Chicago (ORD-01)](https://dchub.cloud/facilities/aligned-data-centers-aligned-chicago-ord-01-aefb28db) | Aligned Data Centers | Operational |  |
| [Aligned Chicago (ORD-02)](https://dchub.cloud/facilities/aligned-data-centers-aligned-chicago-ord-02-f43dcb20) | Aligned Data Centers | Operational |  |
| [Ascent - CH2](https://dchub.cloud/facilities/ascent-llc-ascent-ch2-3ffa1997) | Ascent, LLC | Operational |  |
| [Digital Realty CHI (505 N Railroad)](https://dchub.cloud/facilities/digital-realty-digital-realty-chi-505-n-railroad-2804dffe) | Digital Realty | Operational |  |
| [MICROSOFT CORP-CHICAGO DATA CENTER](https://dchub.cloud/facilities/microsoft-corp-chicago-data-center-d6f9f3c2) | Microsoft | Duplicate |  |
| [Microsoft - Azure Datacenter](https://dchub.cloud/facilities/microsoft-microsoft-azure-datacenter-ea26ad72) | Microsoft | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Illinois](https://dchub.cloud/facilities/in/us/illinois).

## More on Northlake

- [Northlake DCPI score](https://dchub.cloud/dcpi/northlake)
- [Northlake market brief](https://dchub.cloud/markets/northlake/brief)
- [Illinois data center market brief](https://dchub.cloud/states/illinois/brief)
- [Illinois data center tax incentives](https://dchub.cloud/states/illinois/data-center-incentives)

### Email me when the Northlake DCPI verdict changes

Email me when Northlake's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Northlake: 28 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=northlake) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=northlake)

JSON: [/api/v1/markets/northlake/deep-dive](https://dchub.cloud/api/v1/markets/northlake/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Northlake","item":"https://dchub.cloud/markets/northlake"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Northlake Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:15:38.286015+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/northlake",
 "wordCount":277,
 "about":{"@type":"Place","name":"Northlake"},
 "description":"Live data-center market analysis. DCPI score 19.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "northlake", "name": "Northlake Data Center Market — DC Hub", "description": "Live data-center market measurements for Northlake, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/northlake", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Northlake"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 28.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:57."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:57.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:57."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/northlake#webpage", "url": "https://dchub.cloud/markets/northlake", "name": "Northlake data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Northlake data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Northlake market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Northlake data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Northlake market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```