---
description: Is Needham a good data center market for power? DCPI verdict AVOID, score 32.0/100 (ISONE), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Needham data centers: power, grid and capacity | DC Hub"
---

# Needham data center market

Power availability in Needham: DCPI verdict AVOID, composite score 32 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 244 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Needham data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Needham market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.0/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Needham

DC Hub does not hold a lease-rate figure for this market yet.

Needham's tracked data center footprint comprises four facilities operated primarily by Digital Realty, which runs three sites, with LightWave Networks operating one. No capacity figures have been reported across the tracked portfolio, and no recent deal activity has been recorded in this market.

Together, these readings mean that available power headroom is limited and that procurement of incremental supply faces documented obstacles—whether from grid availability, interconnection queues, or utility rate/timing factors. This combination produces an AVOID classification for parties whose site plans depend on new power commitments.

Digital Realty's three-site presence establishes the operator as the dominant player in Needham's tracked market. No transactions have been announced or recorded in this geography during the tracking window, leaving operator positioning and consolidation dynamics opaque. The absence of recent deal flow does not indicate market momentum in either direction; it reflects a gap in recorded M&A or facility-level capital events.

## Data centers in Needham

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty BOS (105 Cabot)](https://dchub.cloud/facilities/digital-realty-digital-realty-bos-105-cabot-bacf62de) | Digital Realty | Operational |  |
| [Digital Realty BOS14 - Boston](https://dchub.cloud/facilities/digital-realty-digital-realty-bos-128-1st-ave-febfb37c) | Digital Realty | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Massachusetts](https://dchub.cloud/facilities/in/us/massachusetts).

## More on Needham

- [Needham DCPI score](https://dchub.cloud/dcpi/needham)
- [Needham market brief](https://dchub.cloud/markets/needham/brief)
- [Massachusetts data center market brief](https://dchub.cloud/states/massachusetts/brief)
- [Massachusetts data center tax incentives](https://dchub.cloud/states/massachusetts/data-center-incentives)

### Email me when the Needham DCPI verdict changes

Email me when Needham's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Needham market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=needham) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=needham)

JSON: [/api/v1/markets/needham/deep-dive](https://dchub.cloud/api/v1/markets/needham/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Needham","item":"https://dchub.cloud/markets/needham"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Needham Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:13:39.671328+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/needham",
 "wordCount":244,
 "about":{"@type":"Place","name":"Needham"},
 "description":"Live data-center market analysis. DCPI score 32.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "needham", "name": "Needham Data Center Market — DC Hub", "description": "Live data-center market measurements for Needham, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/needham", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Needham"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:36."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:36.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:36."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/needham#webpage", "url": "https://dchub.cloud/markets/needham", "name": "Needham data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Needham data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Needham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Needham data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Needham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
