# Nashville data center market

Power availability in Nashville: DCPI verdict AVOID, composite score 27.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 288 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Nashville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Nashville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**27.7/100**

MW, all listings**112**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Nashville at a glance

Nashville has 112 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (100 MW) and 365 Data Centers (12 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 112 |
| Total listed | 112 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Nashville

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Nearest covered market Atlanta (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)) less the secondary-market discount seen in CBRE H1 2026 (figure on paid plans); TN industrial power ~6.8 c/kWh (EIA via DC Hub).

The market has recorded no recent power-and-supply deals tracked by DC Hub, leaving the current operator structure and capacity distribution static over the measured period.

Together, these readings mean new facility buildouts or expansions will face material lead times and cost structures around power sourcing, not insurmountable barriers but real friction points that affect project economics and timeline.

Operator concentration remains stable with no tracked deal activity. The absence of recent M&A, investment rounds, or capacity acquisitions suggests the market is neither consolidating nor expanding through large capital moves. Zoning and permitting friction—evidenced by public opposition to proposed facilities near the Nashville Zoo and broader Tennessee community pushback against data center siting—may be suppressing deal visibility or delaying project announcements rather than eliminating demand.

## Data centers in Nashville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Gallatin Data Center](https://dchub.cloud/facilities/meta-meta-gallatin-data-center-49edb703) | Meta | Operational | 100 |
| [365 DC Nashville](https://dchub.cloud/facilities/365-data-centers-365-dc-nashville-f4d18794) | 365 Data Centers | Operational | 12 |
| [EdgeConneX Nashville (EDCNAS01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-nashville-edcnas01-60b27898) | EdgeConneX Inc. | Operational |  |
| [Flexential Brentwood Data Center](https://dchub.cloud/facilities/unknown-flexential-brentwood-data-center-9e3c46ca) |  | Operational |  |
| [Flexential Nashville - Brentwood](https://dchub.cloud/facilities/flexential-flexential-nashville-brentwood-24b45cfc) | Flexential | Operational |  |
| [Flexential Nashville - Cool Springs](https://dchub.cloud/facilities/flexential-flexential-nashville-cool-springs-fba1ac35) | Flexential | Operational |  |
| [Flexential Nashville - Franklin](https://dchub.cloud/facilities/flexential-flexential-nashville-franklin-85b1722e) | Flexential | Operational |  |
| [H5 Data Centers Nashville](https://dchub.cloud/facilities/365-data-centers-365-data-centers-nashville-na1-d438038d) | 365 Data Centers | Operational |  |
| [H5 Data Centers Nashville (TN01)](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-nashville-tn01-2373424a) | H5 Data Centers | Operational |  |
| [Level(3) Nashville (9th Ave)](https://dchub.cloud/facilities/lumen-technologies-level3-nashville-9th-ave-69eeb9da) | Lumen Technologies | Operational |  |
| [Level(3) Nashville (Sidco Drive)](https://dchub.cloud/facilities/lumen-technologies-level3-nashville-sidco-drive-22d50e5b) | Lumen Technologies | Operational |  |
| [Nashville - Cool Springs](https://dchub.cloud/facilities/flexential-nashville-cool-springs-d9cd70a4) | Flexential | Operational |  |
| [Peace Communications NSH2](https://dchub.cloud/facilities/peace-communications-formerly-nexus-group-peace-communications-nsh2-975492e0) | Peace Communications (Formerly Nexus Group) | Operational |  |
| [Tennessee South Data Center](https://dchub.cloud/facilities/state-of-tennessee-tennessee-south-data-center-5193a661) | State of Tennessee | Operational |  |
| [TierPoint Nashville TN](https://dchub.cloud/facilities/tierpoint-tierpoint-nashville-tn-77d6357d) | TierPoint | Operational |  |
| [Verizon Wireless](https://dchub.cloud/facilities/unknown-verizon-wireless-28aabb4e) |  | Operational |  |
| [XO Nashville](https://dchub.cloud/facilities/xo-xo-nashville-421290d0) | XO | Operational |  |
| [Zayo Nashville - 209 10th Ave. S](https://dchub.cloud/facilities/zayo-group-zayo-nashville-209-10th-ave-s-66a72c4e) | Zayo Group | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Tennessee](https://dchub.cloud/facilities/in/us/tennessee).

## More on Nashville

- [Nashville DCPI score](https://dchub.cloud/dcpi/nashville)
- [Nashville market brief](https://dchub.cloud/markets/nashville/brief)
- [Tennessee data center market brief](https://dchub.cloud/states/tennessee/brief)
- [Tennessee data center tax incentives](https://dchub.cloud/states/tennessee/data-center-incentives)

### Email me when the Nashville DCPI verdict changes

Email me when Nashville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Nashville: 112 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=nashville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=nashville)

JSON: [/api/v1/markets/nashville/deep-dive](https://dchub.cloud/api/v1/markets/nashville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Nashville","item":"https://dchub.cloud/markets/nashville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Nashville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:13:31.979568+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/nashville",
 "wordCount":288,
 "about":{"@type":"Place","name":"Nashville"},
 "description":"Live data-center market analysis. DCPI score 27.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "nashville", "name": "Nashville Data Center Market — DC Hub", "description": "Live data-center market measurements for Nashville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/nashville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Nashville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 112.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 27.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:42."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:42.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:42."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/nashville#webpage", "url": "https://dchub.cloud/markets/nashville", "name": "Nashville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Nashville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Nashville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Nashville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Nashville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```