description: Is Mumbai a good data center market for power? DCPI verdict AVOID, score 15.1/100 (POSOCO), as of 2026-11-12. 494 MW tracked across all listings, unverified included (as of 2026-11-11). Grid, queue and deal context for 300+ markets.
title: "Mumbai data centers: power, grid and capacity | DC Hub"
---

# Mumbai data center market

Power availability in Mumbai: DCPI verdict AVOID, composite score 15.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 236 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Mumbai data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Mumbai market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**15.1/100**

MW, all listings**494**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Mumbai at a glance

Mumbai has 50 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AirTrunk (50 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 50 |
| Total listed | 50 |

## Developers building or planning in Mumbai

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| AirTrunk | 50 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Mumbai

DC Hub does not hold a lease-rate figure for this market yet.

Equinix operates the largest portfolio with six sites, followed by NTTCINS and STT GDC with five and four facilities respectively. CtrlS Datacenters Ltd and NTT each maintain four and three sites on the ground. The operator base remains concentrated among established players with deep India infrastructure experience.

This combination signals material friction for new power procurement. New entrants or existing operators planning capacity expansion face supply-side challenges that extend procurement timelines and increase cost structures for supplementary power solutions.

Recent transaction activity in Mumbai remains untracked, suggesting a pause in recorded deal flow. Equinix has launched purpose-built infrastructure targeting India's AI and cloud workloads, with specific deployment in Mumbai. Tata Communications is deploying 10,000 km of AI-ready fiber to support data center connectivity nationally, which may ease backhaul and interconnection friction for Mumbai-based facilities.

## Data centers in Mumbai

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AirTrunk India](https://dchub.cloud/facilities/airtrunk-airtrunk-india-92231957) | AirTrunk | Under Construction | 50 |
| [AWS AP South 1 (Mumbai)](https://dchub.cloud/facilities/amazon-web-services-aws-ap-south-1-mumbai-e0fc0ae1) | Amazon Web Services | Operational |  |
| [Alibaba Cloud Mumbai DC](https://dchub.cloud/facilities/alibaba-cloud-alibaba-cloud-mumbai-dc-4642d5d6) | Alibaba Cloud | Operational |  |
| [Azure West India Mumbai](https://dchub.cloud/facilities/microsoft-azure-west-india-mumbai-d01a9690) | Microsoft | Operational |  |
| [Bharti Airtel Mumbai](https://dchub.cloud/facilities/bharti-airtel-limited-bharti-airtel-mumbai-e3ee6203) | Bharti Airtel Limited | Operational |  |
| [CtrlS Mumbai](https://dchub.cloud/facilities/ctrls-mumbai-ctrls-mumbai-c3e62e5b) |  | Operational |  |
| [Digital Realty BOM1 Mumbai](https://dchub.cloud/facilities/digital-realty-digital-realty-bom1-mumbai-cec0acc0) | Digital Realty | Operational |  |
| [Equinix MB1 - Mumbai (GPX Mumbai 1)](https://dchub.cloud/facilities/equinix-equinix-mb1-mumbai-gpx-mumbai-1-13c6d81a) | Equinix | Operational |  |
| [Equinix MB2 - Mumbai (GPX Mumbai 2)](https://dchub.cloud/facilities/equinix-equinix-mb2-mumbai-gpx-mumbai-2-69d9b5cf) | Equinix | Operational |  |
| [Equinix MB3 - Mumbai](https://dchub.cloud/facilities/equinix-equinix-mb3-mumbai-c74866b7) | Equinix | Operational |  |
| [Equinix MB4 - Mumbai](https://dchub.cloud/facilities/equinix-equinix-mb4-mumbai-0b12fdde) | Equinix | Operational |  |
| [Google Cloud asia-south1 Mumbai](https://dchub.cloud/facilities/google-google-cloud-asia-south1-mumbai-aa7845e9) | Google | Operational |  |
| [Mumbai](https://dchub.cloud/facilities/equinix-mumbai-c09f2c77) | Equinix | Operational |  |
| [NIXI Mumbai GPX](https://dchub.cloud/facilities/national-internet-exchange-of-india-nixi-mumbai-gpx-1006c357) | National Internet Exchange of India | Operational |  |
| [NTT Mumbai Campus](https://dchub.cloud/facilities/ntt-ntt-mumbai-campus-5b49a41b) | NTT | Operational |  |
| [Netmagic Chandivali - MUM DC06](https://dchub.cloud/facilities/nttcins-netmagic-chandivali-mum-dc06-2e20380e) | NTTCINS | Operational |  |
| [Netmagic Chandivali - MUM DC07](https://dchub.cloud/facilities/nttcins-netmagic-chandivali-mum-dc07-06bc9d1d) | NTTCINS | Operational |  |
| [Netmagic Chandivali - MUM DC09](https://dchub.cloud/facilities/nttcins-netmagic-chandivali-mum-dc09-bfc66955) | NTTCINS | Operational |  |
| [Netmagic Chandivali - MUM-DC05](https://dchub.cloud/facilities/nttcins-netmagic-chandivali-mum-dc05-ec94f1ec) | NTTCINS | Operational |  |
| [Oracle Cloud India Mumbai](https://dchub.cloud/facilities/oracle-oracle-cloud-india-mumbai-0ca75d93) | Oracle | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [India](https://dchub.cloud/facilities/in/in).

## More on Mumbai

- [Mumbai DCPI score](https://dchub.cloud/dcpi/mumbai)
- [Mumbai market brief](https://dchub.cloud/markets/mumbai/brief)
- [Indiana data center market brief](https://dchub.cloud/states/indiana/brief)
- [Indiana data center tax incentives](https://dchub.cloud/states/indiana/data-center-incentives)

### Email me when the Mumbai DCPI verdict changes

Email me when Mumbai's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Mumbai: 494 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=mumbai) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=mumbai)

JSON: [/api/v1/markets/mumbai/deep-dive](https://dchub.cloud/api/v1/markets/mumbai/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Mumbai","item":"https://dchub.cloud/markets/mumbai"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Mumbai Data Center Market Deep-Dive",
 "datePublished":"2026-11-11T09:01:03.660208+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/mumbai",
 "wordCount":236,
 "about":{"@type":"Place","name":"Mumbai"},
 "description":"Live data-center market analysis. DCPI score 15.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "mumbai", "name": "Mumbai Data Center Market — DC Hub", "description": "Live data-center market measurements for Mumbai, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/mumbai", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Mumbai"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 494.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 15.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:58."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:58.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:58."}], "dateModified": "2026-11-11", "temporalCoverage": "2026-11-11"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/mumbai#webpage", "url": "https://dchub.cloud/markets/mumbai", "name": "Mumbai data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Mumbai data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Mumbai market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Mumbai data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Mumbai market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```