---
description: Is Mount Prospect a good data center market for power? DCPI verdict AVOID, score 20.6/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Mount Prospect data centers: power, grid and capacity | DC Hub"
---

# Mount Prospect data center market

Power availability in Mount Prospect: DCPI verdict AVOID, composite score 20.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Mount Prospect data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Mount Prospect market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Mount Prospect

DC Hub does not hold a lease-rate figure for this market yet.

Mount Prospect hosts four tracked facilities operated by a balanced roster of four providers—Apotech, Colocation America Corporation, DataBank, and Netrix LLC—with no dominant operator controlling multiple sites. No recent deals have been tracked in this market, and operator-level megawatt data is not available from current site reports.

The DCPI verdict of AVOID reflects the interaction of these two scores. For operators or tenants seeking to add load or expand footprint, the combination suggests that new power sourcing will require direct engagement with utility providers and may involve extended lead times or infrastructure upgrades beyond standard procurement timelines. The verdict does not reflect market demand or facility quality, but rather the practical difficulty of securing additional power supply in this specific geography.

Deal flow in Mount Prospect is dormant, with no transactions recorded in the tracked period. The four-operator structure—each with single-facility presence—suggests a fragmented market without recent consolidation or acquisition activity.

## Data centers in Mount Prospect

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Apotech](https://dchub.cloud/facilities/apotech-apotech-277869d3) |  | Operational |  |
| [CDC3 - 800 E Business Center Dr](https://dchub.cloud/facilities/colocation-america-corporation-cdc3-800-e-business-center-dr-960b2704) | Colocation America Corporation | Operational |  |
| [DataBank Chicago (ORD3)](https://dchub.cloud/facilities/databank-databank-chicago-ord3-a9e20a22) | DataBank | Operational |  |
| [NETRIX - MTP](https://dchub.cloud/facilities/netrix-llc-netrix-mtp-40263fe1) | Netrix LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Illinois](https://dchub.cloud/facilities/in/us/illinois).

## More on Mount Prospect

- [Mount Prospect DCPI score](https://dchub.cloud/dcpi/mount-prospect)
- [Mount Prospect market brief](https://dchub.cloud/markets/mount-prospect/brief)
- [Illinois data center market brief](https://dchub.cloud/states/illinois/brief)
- [Illinois data center tax incentives](https://dchub.cloud/states/illinois/data-center-incentives)

### Email me when the Mount Prospect DCPI verdict changes

Email me when Mount Prospect's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Mount Prospect market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=mount-prospect) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=mount-prospect)

JSON: [/api/v1/markets/mount-prospect/deep-dive](https://dchub.cloud/api/v1/markets/mount-prospect/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Mount Prospect","item":"https://dchub.cloud/markets/mount-prospect"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Mount Prospect Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:13:15.944797+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/mount-prospect",
 "wordCount":228,
 "about":{"@type":"Place","name":"Mount Prospect"},
 "description":"Live data-center market analysis. DCPI score 20.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "mount-prospect", "name": "Mount Prospect Data Center Market — DC Hub", "description": "Live data-center market measurements for Mount Prospect, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/mount-prospect", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Mount Prospect"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:05."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:05.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:05."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/mount-prospect#webpage", "url": "https://dchub.cloud/markets/mount-prospect", "name": "Mount Prospect data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Mount Prospect data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Mount Prospect market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Mount Prospect data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Mount Prospect market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
