description: Is Moses Lake a good data center market for power? DCPI verdict CAUTION, score 47.1/100 (WECC), as of 2026-11-12. 310 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Moses Lake data centers: power, grid and capacity | DC Hub"
---

# Moses Lake data center market

Power availability in Moses Lake: DCPI verdict CAUTION, composite score 47.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 281 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Moses Lake data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Moses Lake market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.1/100**

MW, all listings**310**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**CAUTION**

## Moses Lake at a glance

Moses Lake has 310 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (150 MW), Prime Data Centers (100 MW) and Edged (60 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 310 |
| Total listed | 310 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Moses Lake

DC Hub does not hold a lease-rate figure for this market yet.

Moses Lake hosts 310 MW across four tracked facilities operated by Edged, Microsoft, Prime Data Centers, and Serverfarm. The market remains fragmented among multiple operators with no single dominant player, and no recent deal activity has been recorded in the tracked registry.

Together, these scores suggest that adding new capacity or expanding existing facilities will require deliberate power procurement planning and likely involve engagement with regional grid operators and utility infrastructure timelines.

No recent deals have been tracked in Moses Lake, and operator composition remains stable. The four-way split among Edged, Microsoft, Prime Data Centers, and Serverfarm suggests a market without clear recent consolidation or capital reallocation. Regional developments bear monitoring: Keel has publicly advanced plans for an onsite backup power system at its Moses Lake facility, signaling operator confidence in long-term operations at the site. AWS has moved forward with its first data center project in Washington State, though that facility is sited in adjacent Walla Walla rather than Moses Lake, underscoring that hyperscaler expansion in the region does not automatically flow to every local market.

## Data centers in Moses Lake

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Microsoft Moses Lake](https://dchub.cloud/facilities/microsoft-microsoft-moses-lake-88761830) | Microsoft | Operational | 150 |
| [Prime Moses Lake](https://dchub.cloud/facilities/prime-data-centers-prime-moses-lake-37e48d1c) | Prime Data Centers | Operational | 100 |
| [Edged Moses Lake](https://dchub.cloud/facilities/edged-edged-moses-lake-1bf4e7c4) | Edged | Operational | 60 |
| [Serverfarm TiTAN Moses Lake](https://dchub.cloud/facilities/serverfarm-serverfarm-titan-moses-lake-bc9ef7f5) | Serverfarm | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on Moses Lake

- [Moses Lake DCPI score](https://dchub.cloud/dcpi/moses-lake)
- [Moses Lake market brief](https://dchub.cloud/markets/moses-lake/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Moses Lake DCPI verdict changes

Email me when Moses Lake's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Moses Lake: 310 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=moses-lake) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=moses-lake)

JSON: [/api/v1/markets/moses-lake/deep-dive](https://dchub.cloud/api/v1/markets/moses-lake/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Moses Lake","item":"https://dchub.cloud/markets/moses-lake"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Moses Lake Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:12:59.842177+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/moses-lake",
 "wordCount":281,
 "about":{"@type":"Place","name":"Moses Lake"},
 "description":"Live data-center market analysis. DCPI score 47.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "moses-lake", "name": "Moses Lake Data Center Market — DC Hub", "description": "Live data-center market measurements for Moses Lake, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/moses-lake", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Moses Lake"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 310.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:03."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:03.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:03."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/moses-lake#webpage", "url": "https://dchub.cloud/markets/moses-lake", "name": "Moses Lake data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Moses Lake data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Moses Lake market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Moses Lake data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Moses Lake market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```