---
description: Is Montréal (Montreal) a good data center market for power? DCPI verdict BUILD, score 69.8/100 (HQ), as of 2026-11-12. 185 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Montréal (Montreal) data centers: power, grid and capacity | DC Hub"
---

# Montréal (Montreal) data center market

Power availability in Montréal (Montreal): DCPI verdict BUILD, composite score 69.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 301 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Montréal (Montreal) data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Montréal (Montreal) market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**69.8/100**

MW, all listings**185**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Montréal at a glance

Montréal has 95 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (50 MW) and Cologix (45 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 95 |
| Total listed | 95 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Montréal

DC Hub does not hold a lease-rate figure for this market yet.

The DCPI verdict of BUILD reflects power supply conditions that favor new capacity deployment. Operators considering new builds should expect standard permitting and grid coordination cycles rather than supply-side delays.

Recent tracked deal flow in Montréal has stalled: no transactions are recorded in the current window. This absence contrasts with broader Canadian momentum, where acquisitions and major investments continue across other markets. The lack of announced acquisitions or sales does not indicate declining utilization or competitive weakness—it simply reflects a period without tracked M&A or major capital announcements.

## Data centers in Montréal

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Vantage Montreal](https://dchub.cloud/facilities/vantage-data-centers-vantage-montreal-5d873537) | Vantage Data Centers | Operational | 50 |
| [Cologix Montreal 2](https://dchub.cloud/facilities/cologix-cologix-montreal-2-e552cdb1) | Cologix | Operational | 25 |
| [Cologix Montreal 1](https://dchub.cloud/facilities/cologix-cologix-montreal-1-0b4583c7) | Cologix | Operational | 20 |
| [740 Notre-Dame West Montreal](https://dchub.cloud/facilities/740-notre-dame-west-montreal-740-notre-dame-west-montreal-e5f3dbaa) |  | Operational |  |
| [AWS CA Central 1 (Montreal)](https://dchub.cloud/facilities/amazon-web-services-aws-ca-central-1-montreal-b259b36b) | Amazon Web Services | Operational |  |
| [Bell Canada](https://dchub.cloud/facilities/bell-canada-bell-canada-09d4997f) |  | Operational |  |
| [Cologix MTL11](https://dchub.cloud/facilities/cologix-inc-cologix-mtl11-18e08d2c) | Cologix, Inc. | Operational |  |
| [Cologix MTL12](https://dchub.cloud/facilities/cologix-inc-cologix-mtl12-035c1c2e) | Cologix, Inc. | Operational |  |
| [Cologix MTL3](https://dchub.cloud/facilities/cologix-inc-cologix-mtl3-4cdd376e) | Cologix, Inc. | Operational |  |
| [Cologix MTL8](https://dchub.cloud/facilities/cologix-inc-cologix-mtl8-d53a7129) | Cologix, Inc. | Operational |  |
| [Cronomagic Canada Inc](https://dchub.cloud/facilities/cronomagic-cronomagic-canada-inc-cfa18a52) | Cronomagic | Operational |  |
| [Enovum Datacenters MTL01](https://dchub.cloud/facilities/enovum-datacenters-enovum-datacenters-mtl01-7bcce348) | Enovum Datacenters | Operational |  |
| [Google Cloud northamerica-northeast1 Montreal](https://dchub.cloud/facilities/google-google-cloud-northamerica-northeast1-montreal-1189adc9) | Google | Operational |  |
| [Oracle Cloud Canada Montreal](https://dchub.cloud/facilities/oracle-oracle-cloud-canada-montreal-abd442ef) | Oracle | Operational |  |
| [eStruxture Montreal Campus](https://dchub.cloud/facilities/estruxture-estruxture-montreal-campus-f49c3b5a) | eStruxture | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Canada](https://dchub.cloud/facilities/in/ca).

## More on Montréal

- [Montréal DCPI score](https://dchub.cloud/dcpi/montreal)
- [Montréal market brief](https://dchub.cloud/markets/montreal/brief)

### Email me when the Montréal DCPI verdict changes

Email me when Montréal's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Montréal: 185 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=montreal) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=montreal)

JSON: [/api/v1/markets/montreal/deep-dive](https://dchub.cloud/api/v1/markets/montreal/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Montreal","item":"https://dchub.cloud/markets/montreal"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Montréal (Montreal) Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:12:52.865044+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/montreal",
 "wordCount":301,
 "about":{"@type":"Place","name":"Montréal (Montreal)"},
 "description":"Live data-center market analysis. DCPI score 69.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "montreal", "name": "Montréal Data Center Market — DC Hub", "description": "Live data-center market measurements for Montréal, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/montreal", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Montréal"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 185.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 69.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:23."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:23.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:23."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/montreal#webpage", "url": "https://dchub.cloud/markets/montreal", "name": "Montréal (Montreal) data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Montréal (Montreal) data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Montréal (Montreal) market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Montréal (Montreal) data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Montréal (Montreal) market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
