# Montgomery data center market

Power availability in Montgomery: DCPI verdict AVOID, composite score 23.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 230 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Montgomery data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Montgomery market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**23.4/100**

MW, all listings**304**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Montgomery at a glance

Montgomery has 77 MW under construction and 75 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (152 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 77 |
| Planned | 75 |
| Total listed | 152 |

## Developers building or planning in Montgomery

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Meta | 77 | 75 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Montgomery

DC Hub does not hold a lease-rate figure for this market yet.

Meta Platforms operates the largest deployed presence with multiple sites in the region, alongside infrastructure from Verizon Montgomery, DOTIER LLC, and the Retirement Systems of Alabama. No recent power purchase agreements or capacity expansions have been recorded in the transaction registry.

The combination yields an AVOID designation specifically for power procurement planning. Sites seeking to expand or newly build in Montgomery will encounter extended lead times for utility upgrades and elevated costs for grid capacity requests. This is not a statement about demand; it reflects the practical mechanics of adding MW to the local supply chain.

Operator concentration remains high, with Meta operating six of fourteen tracked sites. Deal flow has stalled entirely—no recent transactions appear in the tracked registry, contrasting with broader sector momentum where major platforms continue to secure capacity in other regions. Verizon Montgomery's single tracked site and RSA's entry indicate some operator diversity, yet the footprint remains heavily weighted toward Meta's internal build program.

## Data centers in Montgomery

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Montgomery Building 1](https://dchub.cloud/facilities/meta-meta-montgomery-building-1-05b41c91) | Meta | Under Construction | 75 |
| [Meta Montgomery Building 2](https://dchub.cloud/facilities/meta-meta-montgomery-building-2-160924ed) | Meta | Planned | 75 |
| [Meta Montgomery Data Center](https://dchub.cloud/facilities/meta-meta-montgomery-data-center-6bc513d3) | Meta | Under Construction | 2 |
| [Houston Bunker](https://dchub.cloud/facilities/the-houston-bunker-houston-bunker-82d07ff3) | The Houston Bunker | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Alabama](https://dchub.cloud/facilities/in/us/alabama).

## More on Montgomery

- [Montgomery DCPI score](https://dchub.cloud/dcpi/montgomery)
- [Montgomery market brief](https://dchub.cloud/markets/montgomery/brief)
- [Alabama data center market brief](https://dchub.cloud/states/alabama/brief)
- [Alabama data center tax incentives](https://dchub.cloud/states/alabama/data-center-incentives)

### Email me when the Montgomery DCPI verdict changes

Email me when Montgomery's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Montgomery: 304 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=montgomery) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=montgomery)

JSON: [/api/v1/markets/montgomery/deep-dive](https://dchub.cloud/api/v1/markets/montgomery/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Montgomery","item":"https://dchub.cloud/markets/montgomery"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Montgomery Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:12:43.990936+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/montgomery",
 "wordCount":230,
 "about":{"@type":"Place","name":"Montgomery"},
 "description":"Live data-center market analysis. DCPI score 23.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "montgomery", "name": "Montgomery Data Center Market — DC Hub", "description": "Live data-center market measurements for Montgomery, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/montgomery", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Montgomery"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 304.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 23.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:16."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:16.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:16."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/montgomery#webpage", "url": "https://dchub.cloud/markets/montgomery", "name": "Montgomery data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Montgomery data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Montgomery market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Montgomery data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Montgomery market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```