description: Is Monroe a good data center market for power? DCPI verdict AVOID, score 31.3/100 (SERC), as of 2026-11-12. 250 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Monroe data centers: power, grid and capacity | DC Hub"
---

# Monroe data center market

Power availability in Monroe: DCPI verdict AVOID, composite score 31.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 196 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Monroe data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Monroe market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**31.3/100**

MW, all listings**250**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Monroe at a glance

Monroe has 250 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (250 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 250 |
| Total listed | 250 |

## Developers building or planning in Monroe

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Meta | 250 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Monroe

DC Hub does not hold a lease-rate figure for this market yet.

Monroe's tracked footprint comprises three facilities, with only one operator publicly reporting capacity metrics. Meta operates a single site in the market. No recent deals have been tracked in Monroe.

This combination yields an AVOID verdict for parties planning to source new power in this market.

Operator presence is concentrated: Meta represents the sole tracked operator. The absence of recent deal activity in Monroe suggests either market saturation among existing participants or limited near-term expansion interest in the region.

Forward planning in Monroe will likely depend on utility dialogue around incremental grid capacity rather than self-help power procurement strategies.

## Data centers in Monroe

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Monroe NC Campus](https://dchub.cloud/facilities/meta-meta-monroe-nc-campus-d56abd68) | Meta | Under Construction | 250 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [North Carolina](https://dchub.cloud/facilities/in/us/north-carolina).

## More on Monroe

- [Monroe DCPI score](https://dchub.cloud/dcpi/monroe)
- [Monroe market brief](https://dchub.cloud/markets/monroe/brief)
- [North Carolina data center market brief](https://dchub.cloud/states/north-carolina/brief)
- [North Carolina data center tax incentives](https://dchub.cloud/states/north-carolina/data-center-incentives)

### Email me when the Monroe DCPI verdict changes

Email me when Monroe's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Monroe: 250 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=monroe) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=monroe)

JSON: [/api/v1/markets/monroe/deep-dive](https://dchub.cloud/api/v1/markets/monroe/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Monroe","item":"https://dchub.cloud/markets/monroe"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Monroe Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:55:19.897354+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/monroe",
 "wordCount":196,
 "about":{"@type":"Place","name":"Monroe"},
 "description":"Live data-center market analysis. DCPI score 31.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "monroe", "name": "Monroe Data Center Market — DC Hub", "description": "Live data-center market measurements for Monroe, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/monroe", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Monroe"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 250.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 31.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:23."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:23.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:23."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/monroe#webpage", "url": "https://dchub.cloud/markets/monroe", "name": "Monroe data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Monroe data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Monroe market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Monroe data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Monroe market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```