Power availability in Modesto: DCPI verdict CAUTION, composite score 50.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 266 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Modesto data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Modesto market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.9/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Modesto

DC Hub does not hold a lease-rate figure for this market yet.

Modesto has three tracked facilities operated by Ayera Technologies, Volt Broadband, and Yosemite Community College District, with no recent deal activity recorded. Only one operator in the tracked set has reported megawatt figures to the database. The region sits at an inflection point between available generation capacity and grid access friction.

The DCPI verdict of CAUTION reflects a mixed signal on incremental power procurement. New entrants should expect moderate difficulty in securing firm power contracts and interconnection capacity, particularly given the upstream grid topology serving the Central Valley.

Deal flow has stalled: no transactions have been tracked in recent periods. The operator base remains small and fragmented, with no single entity commanding scale. Community reaction to potential data center development has intensified—public opposition mounted at city hall and irrigation board meetings reflects local sensitivity to land use, water demand, and grid stress. These dynamics do not alter power supply facts, but they shape the permitting and political environment in which power infrastructure must be sited and constructed.

## Data centers in Modesto

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [801 Tenth Street Modesto (Ayera)](https://dchub.cloud/facilities/ayera-technologies-inc-801-tenth-street-modesto-ayera-d9192be7) | Ayera Technologies, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Modesto

- [Modesto DCPI score](https://dchub.cloud/dcpi/modesto)
- [Modesto market brief](https://dchub.cloud/markets/modesto/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Modesto DCPI verdict changes

Email me when Modesto's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Modesto market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=modesto) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=modesto)

JSON: [/api/v1/markets/modesto/deep-dive](https://dchub.cloud/api/v1/markets/modesto/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Modesto","item":"https://dchub.cloud/markets/modesto"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Modesto Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:54:37.658907+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/modesto",
 "wordCount":266,
 "about":{"@type":"Place","name":"Modesto"},
 "description":"Live data-center market analysis. DCPI score 50.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "modesto", "name": "Modesto Data Center Market — DC Hub", "description": "Live data-center market measurements for Modesto, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/modesto", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Modesto"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:01."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:01.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:01."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/modesto#webpage", "url": "https://dchub.cloud/markets/modesto", "name": "Modesto data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Modesto data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Modesto market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Modesto data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Modesto market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```