---
description: Is Minnetonka a good data center market for power? DCPI verdict CAUTION, score 47.7/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Minnetonka data centers: power, grid and capacity | DC Hub"
---

# Minnetonka data center market

Power availability in Minnetonka: DCPI verdict CAUTION, composite score 47.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 273 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Minnetonka data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Minnetonka market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.7/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Minnetonka

DC Hub does not hold a lease-rate figure for this market yet.

The market shows moderate headroom in available power relative to demand, though regional activity has been concentrated in adjacent Minneapolis markets where DataBank has pursued acquisition-based consolidation, including the purchase of an Eagan facility and a leased Minneapolis data center from Mapletree Industrial Trust. No recent transaction activity has been tracked in Minnetonka itself, distinguishing it from neighboring submarkets where third-party deal flow has occurred.

The DCPI verdict of CAUTION reflects mixed signals on new power provisioning.

Operator concentration remains narrow with only two tracked facilities in Minnetonka proper. This absence does not indicate demand weakness but reflects the current distribution of available capacity and operator portfolios in the region. US Internet and Ridgeview maintain local presence, though growth and infrastructure decisions in the Twin Cities region have tilted toward contiguous markets where larger transactions have been announced.

Forward movement in Minnetonka's power and supply profile will depend on whether regional demand pressures spill into the market or whether existing operators pursue internal capacity expansions.

## Data centers in Minnetonka

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Ridgeview Minnetonka](https://dchub.cloud/facilities/ridgeview-ridgeview-minnetonka-98fb716d) | Ridgeview | Operational |  |
| [US Internet - Minnetonka](https://dchub.cloud/facilities/us-internet-us-internet-minnetonka-15f960c0) | US Internet | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Minnesota](https://dchub.cloud/facilities/in/us/minnesota).

## More on Minnetonka

- [Minnetonka DCPI score](https://dchub.cloud/dcpi/minnetonka)
- [Minnetonka market brief](https://dchub.cloud/markets/minnetonka/brief)
- [Minnesota data center market brief](https://dchub.cloud/states/minnesota/brief)
- [Minnesota data center tax incentives](https://dchub.cloud/states/minnesota/data-center-incentives)

### Email me when the Minnetonka DCPI verdict changes

Email me when Minnetonka's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Minnetonka market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=minnetonka) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=minnetonka)

JSON: [/api/v1/markets/minnetonka/deep-dive](https://dchub.cloud/api/v1/markets/minnetonka/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Minnetonka","item":"https://dchub.cloud/markets/minnetonka"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Minnetonka Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:12:34.340701+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/minnetonka",
 "wordCount":273,
 "about":{"@type":"Place","name":"Minnetonka"},
 "description":"Live data-center market analysis. DCPI score 47.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "minnetonka", "name": "Minnetonka Data Center Market — DC Hub", "description": "Live data-center market measurements for Minnetonka, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/minnetonka", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Minnetonka"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:10."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:10.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:10."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/minnetonka#webpage", "url": "https://dchub.cloud/markets/minnetonka", "name": "Minnetonka data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Minnetonka data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Minnetonka market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Minnetonka data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Minnetonka market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
