---
description: Is Minneapolis a good data center market for power? DCPI verdict CAUTION, score 45.8/100 (MISO), as of 2026-11-12. 73 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Minneapolis data centers: power, grid and capacity | DC Hub"
---

# Minneapolis data center market

Power availability in Minneapolis: DCPI verdict CAUTION, composite score 45.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 295 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Minneapolis data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Minneapolis market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.8/100**

MW, all listings**73**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Minneapolis at a glance

Minneapolis has 38 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Cologix (14 MW), DataBank (14 MW) and Involta (10 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 38 |
| Total listed | 38 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Minneapolis

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Minneapolis (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

Cologix and DataBank each operate six facilities, with Cologix, Inc. managing five additional sites.

The DCPI verdict of CAUTION reflects the tension between these two scores. The combination does not prohibit new capacity but requires deliberate planning around power procurement timelines.

DataBank has been active in the Minneapolis market, exercising an option to acquire a leased facility from Mapletree Industrial Trust and acquiring the building housing MSP2. These transactions reflect engagement with existing stock rather than greenfield development announcements. No recent third-party acquisitions or major M&A events are tracked in the current registry beyond DataBank's facility purchases.

Power procurement strategy in Minneapolis will likely center on maximizing utilization of existing interconnection agreements and evaluating secondary power routes rather than betting on near-term primary utility capacity expansion.

## Data centers in Minneapolis

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cologix Minneapolis](https://dchub.cloud/facilities/cologix-cologix-minneapolis-b82848ed) | Cologix | Operational | 14 |
| [Involta Minneapolis](https://dchub.cloud/facilities/involta-involta-minneapolis-c12ebb50) | Involta | Operational | 10 |
| [DataBank MSP2](https://dchub.cloud/facilities/databank-databank-msp2-8eb7a692) | DataBank | Operational | 8 |
| [DataBank MSP1](https://dchub.cloud/facilities/databank-databank-msp1-a1783f47) | DataBank | Operational | 6 |
| [Atomic Data MSP250](https://dchub.cloud/facilities/atomic-data-llc-atomic-data-msp250-0635036d) | Atomic Data LLC | Operational |  |
| [Aureon Minneapolis](https://dchub.cloud/facilities/aureon-network-services-aureon-minneapolis-41868fde) | Aureon Network Services | Operational |  |
| [Cologix MIN3](https://dchub.cloud/facilities/cologix-inc-cologix-min3-a174c80b) | Cologix, Inc. | Operational |  |
| [Lumen Minneapolis 3](https://dchub.cloud/facilities/lumen-technologies-lumen-minneapolis-3-7620b460) | Lumen Technologies | Operational |  |
| [T5@Minneapolis](https://dchub.cloud/facilities/t5-data-centers-t5minneapolis-a2cdd4ad) | T5 Data Centers | Operational |  |
| [TriTech Center](https://dchub.cloud/facilities/dci-technology-minneapolis-llc-tritech-center-8021c6b9) | DCI Technology Minneapolis, LLC | Operational |  |
| [Zayo Minneapolis - 10300 6th Ave N](https://dchub.cloud/facilities/zayo-group-zayo-minneapolis-10300-6th-ave-n-19c681f9) | Zayo Group | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Minnesota](https://dchub.cloud/facilities/in/us/minnesota).

## More on Minneapolis

- [Minneapolis DCPI score](https://dchub.cloud/dcpi/minneapolis)
- [Minneapolis market brief](https://dchub.cloud/markets/minneapolis/brief)
- [Minnesota data center market brief](https://dchub.cloud/states/minnesota/brief)
- [Minnesota data center tax incentives](https://dchub.cloud/states/minnesota/data-center-incentives)

### Email me when the Minneapolis DCPI verdict changes

Email me when Minneapolis's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Minneapolis: 73 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=minneapolis) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=minneapolis)

JSON: [/api/v1/markets/minneapolis/deep-dive](https://dchub.cloud/api/v1/markets/minneapolis/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Minneapolis","item":"https://dchub.cloud/markets/minneapolis"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Minneapolis Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:12:25.613605+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/minneapolis",
 "wordCount":295,
 "about":{"@type":"Place","name":"Minneapolis"},
 "description":"Live data-center market analysis. DCPI score 45.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "minneapolis", "name": "Minneapolis Data Center Market — DC Hub", "description": "Live data-center market measurements for Minneapolis, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/minneapolis", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Minneapolis"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 73.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:38."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:38.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:38."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/minneapolis#webpage", "url": "https://dchub.cloud/markets/minneapolis", "name": "Minneapolis data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Minneapolis data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Minneapolis market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Minneapolis data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Minneapolis market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
