---
description: Is Milpitas a good data center market for power? DCPI verdict CAUTION, score 50.3/100 (CAISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Milpitas data centers: power, grid and capacity | DC Hub"
---

# Milpitas data center market

Power availability in Milpitas: DCPI verdict CAUTION, composite score 50.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 233 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Milpitas data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Milpitas market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Milpitas

DC Hub does not hold a lease-rate figure for this market yet.

Milpitas hosts three tracked data center facilities operated primarily by CoreSite entities. No facility in the market has submitted megawatt capacity data to DC Hub's tracking system, leaving total operational footprint undisclosed.

The DCPI verdict of CAUTION reflects tension between available power supply and grid access friction. Operators seeking incremental power in Milpitas face a mixed picture: supply exists but securing access requires navigating non-trivial infrastructure or contractual barriers.

CoreSite operates two facilities in Milpitas, with CoreSite Real Estate 1656 McCarthy, L.P. holding a third. The market has recorded no recent deal activity in DC Hub's tracking window, leaving current operator expansion and contract dynamics opaque. This absence of tracked transactions does not characterize market momentum or demand, only that no announcements have been logged against Milpitas properties during the period surveyed.

Power procurement decisions in Milpitas will likely hinge on individual facility interconnection status and existing power contracts rather than market-wide availability.

## Data centers in Milpitas

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CoreSite SV3 Milpitas](https://dchub.cloud/facilities/coresite-coresite-sv3-milpitas-459687cd) | CoreSite | Operational |  |
| [Coresite - Milpitas (SV2)](https://dchub.cloud/facilities/coresite-coresite-milpitas-sv2-ebe5f6a8) | CoreSite | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Milpitas

- [Milpitas DCPI score](https://dchub.cloud/dcpi/milpitas)
- [Milpitas market brief](https://dchub.cloud/markets/milpitas/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Milpitas DCPI verdict changes

Email me when Milpitas's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Milpitas market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=milpitas) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=milpitas)

JSON: [/api/v1/markets/milpitas/deep-dive](https://dchub.cloud/api/v1/markets/milpitas/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Milpitas","item":"https://dchub.cloud/markets/milpitas"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Milpitas Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:11:53.256777+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/milpitas",
 "wordCount":233,
 "about":{"@type":"Place","name":"Milpitas"},
 "description":"Live data-center market analysis. DCPI score 50.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "milpitas", "name": "Milpitas Data Center Market — DC Hub", "description": "Live data-center market measurements for Milpitas, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/milpitas", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Milpitas"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:55."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:55.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:55."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/milpitas#webpage", "url": "https://dchub.cloud/markets/milpitas", "name": "Milpitas data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Milpitas data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Milpitas market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Milpitas data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Milpitas market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
