---
description: Is Milan a good data center market for power? DCPI verdict AVOID, score 11.8/100 (ENTSOE-IT), as of 2026-11-12. 430 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Milan data centers: power, grid and capacity | DC Hub"
---

# Milan data center market

Power availability in Milan: DCPI verdict AVOID, composite score 11.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 237 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Milan data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Milan market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**11.8/100**

MW, all listings**430**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Milan at a glance

Milan has 130 MW operational and 50 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are STACK (80 MW), Compass Datacenters (50 MW) and Stack Infrastructure (50 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 130 |
| Under construction | 50 |
| Total listed | 180 |

## Developers building or planning in Milan

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass Datacenters | 50 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Milan

DC Hub does not hold a lease-rate figure for this market yet.

The market has recorded a single tracked deal: Greenfield and Finsbury Infrastructure's investment commitment of $391.2M, announced without completion status confirmed.

Grid connection timelines, transmission capacity bottlenecks, and local permitting requirements create friction that pushes the cost and timeline risk of new power arrangements above acceptable thresholds for operators seeking to establish or expand footprint.

Operator concentration remains moderate, with no single player controlling more than 5% of tracked facilities. Regional precedent is instructive: Moncalieri's largest-data-center proposal was halted by municipal decision, and Digital Realty's Milan development plans remain in planning stages without announced financial terms.

## Data centers in Milan

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Compass Datacenters Milan](https://dchub.cloud/facilities/compass-datacenters-compass-datacenters-milan-892e0f81) | Compass Datacenters | Under Construction | 50 |
| [Stack Milan](https://dchub.cloud/facilities/stack-infrastructure-stack-milan-55fc26af) | Stack Infrastructure | Operational | 50 |
| [STACK MILL1A](https://dchub.cloud/facilities/stack-stack-mill1a-4c5691da) | STACK | Operational | 40 |
| [STACK MILL1B](https://dchub.cloud/facilities/stack-stack-mill1b-1ad78f9f) | STACK | Operational | 40 |
| [AWS EU South 1 (Milan)](https://dchub.cloud/facilities/amazon-web-services-aws-eu-south-1-milan-6ef8f791) | Amazon Web Services | Operational |  |
| [Azure Italy North Milan](https://dchub.cloud/facilities/microsoft-azure-italy-north-milan-a4d57461) | Microsoft | Operational |  |
| [C21](https://dchub.cloud/facilities/cdlan-spa-c21-3d8ca2c1) | CDLAN SpA | Operational |  |
| [Colt DCS Milan](https://dchub.cloud/facilities/colt-dcs-colt-dcs-milan-b83bdace) | Colt DCS | Operational |  |
| [EXA Edge DC Milan](https://dchub.cloud/facilities/exa-infrastructure-exa-edge-dc-milan-a3cf1361) | EXA Infrastructure | Operational |  |
| [Equinix ML2 - Milan, Savona](https://dchub.cloud/facilities/equinix-equinix-ml2-milan-savona-4775af82) | Equinix | Operational |  |
| [Equinix ML3 - Milan, Basiglio](https://dchub.cloud/facilities/equinix-equinix-ml3-milan-basiglio-01858361) | Equinix | Operational |  |
| [Equinix ML4 - Milan, Cascia](https://dchub.cloud/facilities/equinix-equinix-ml4-milan-cascia-d6c5d9ad) | Equinix | Operational |  |
| [Equinix ML7x](https://dchub.cloud/facilities/equinix-equinix-ml7x-94742d2d) | Equinix | Operational |  |
| [Google Cloud europe-west8 Milan](https://dchub.cloud/facilities/google-google-cloud-europe-west8-milan-e54a2ba8) | Google | Operational |  |
| [Keppel Data Centres \| Milan Data Centre](https://dchub.cloud/facilities/keppel-data-centres-holding-pte-ltd-keppel-data-centres-milan-data-centre-78418eb9) | Keppel Data Centres Holding Pte Ltd | Operational |  |
| [Oracle Cloud Italy Milan](https://dchub.cloud/facilities/oracle-oracle-cloud-italy-milan-d5f1484e) | Oracle | Operational |  |
| [Retelit Avalon 1](https://dchub.cloud/facilities/retelit-spa-retelit-avalon-1-b5ea1079) | Retelit S.p.A. | Operational |  |
| [Retelit Avalon 3](https://dchub.cloud/facilities/retelit-spa-retelit-avalon-3-3ac39464) | Retelit S.p.A. | Operational |  |
| [Seeweb Milano Caldera](https://dchub.cloud/facilities/seeweb-srl-seeweb-milano-caldera-c686f91f) | Seeweb Srl | Operational |  |
| [Telnet Caldera Milan](https://dchub.cloud/facilities/telnet-telnet-caldera-milan-296f5c09) | Telnet | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Italy](https://dchub.cloud/facilities/in/it).

## More on Milan

- [Milan DCPI score](https://dchub.cloud/dcpi/milan)
- [Milan market brief](https://dchub.cloud/markets/milan/brief)

### Email me when the Milan DCPI verdict changes

Email me when Milan's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Milan: 430 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=milan) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=milan)

JSON: [/api/v1/markets/milan/deep-dive](https://dchub.cloud/api/v1/markets/milan/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Milan","item":"https://dchub.cloud/markets/milan"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Milan Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:11:38.611898+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/milan",
 "wordCount":237,
 "about":{"@type":"Place","name":"Milan"},
 "description":"Live data-center market analysis. DCPI score 11.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "milan", "name": "Milan Data Center Market — DC Hub", "description": "Live data-center market measurements for Milan, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/milan", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Milan"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 430.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 11.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:45."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/milan#webpage", "url": "https://dchub.cloud/markets/milan", "name": "Milan data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Milan data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Milan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Milan data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Milan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
