---
description: Is Midrand a good data center market for power? DCPI verdict AVOID, score 22.8/100 (ESKOM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Midrand data centers: power, grid and capacity | DC Hub"
---

# Midrand data center market

Power availability in Midrand: DCPI verdict AVOID, composite score 22.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 281 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Midrand data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Midrand market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Midrand

DC Hub does not hold a lease-rate figure for this market yet.

Midrand hosts eight tracked facilities operated by a small cluster of providers anchored by Africa Data Centres' two sites. The market remains opaque on total installed capacity—only one of the eight tracked sites has reported megawattage figures to the market. Africa Data Centres and BCX each operate standalone facilities, while Bunker One Management and MTN each run single assets, creating a fragmented operational landscape with no dominant player controlling infrastructure narrative or supply roadmap.

This dual reading means prospective operators should expect both limited headroom in available power and material lead times or cost elevation to unlock additional grid access—a combination that depresses economics for greenfield or expansion projects requiring incremental supply.

Deal flow in Midrand remains dormant on the tracked record, with no recent transactions logged. At the pan-African level, MTN announced a data center partnership in August 2026 targeting over 150MW of new capacity in its first phase, signaling appetite from hyperscale telecoms to build regional infrastructure; however, no announcement ties that expansion explicitly to Midrand. The operator base shows no visible consolidation, M&A activity, or capacity announcements specific to this market, leaving visibility into future supply or competitive repositioning opaque.

## Data centers in Midrand

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Africa Data Centres](https://dchub.cloud/facilities/africa-data-centres-africa-data-centres-62a55ee7) |  | Operational |  |
| [Africa Data Centres, Johannesburg JHB1, South Africa](https://dchub.cloud/facilities/africa-data-centres-africa-data-centres-johannesburg-jhb1-south-africa-02513258) | Africa Data Centres | Operational |  |
| [Vantage JNB11](https://dchub.cloud/facilities/vantage-data-centers-vantage-jnb11-4c2686c6) | Vantage Data Centers | Operational |  |
| [Vodacom](https://dchub.cloud/facilities/vodacom-vodacom-423a016a) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [South Africa](https://dchub.cloud/facilities/in/za).

## More on Midrand

- [Midrand DCPI score](https://dchub.cloud/dcpi/midrand)
- [Midrand market brief](https://dchub.cloud/markets/midrand/brief)

### Email me when the Midrand DCPI verdict changes

Email me when Midrand's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Midrand market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=midrand) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=midrand)

JSON: [/api/v1/markets/midrand/deep-dive](https://dchub.cloud/api/v1/markets/midrand/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Midrand","item":"https://dchub.cloud/markets/midrand"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Midrand Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:11:30.035656+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/midrand",
 "wordCount":281,
 "about":{"@type":"Place","name":"Midrand"},
 "description":"Live data-center market analysis. DCPI score 22.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "midrand", "name": "Midrand Data Center Market — DC Hub", "description": "Live data-center market measurements for Midrand, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/midrand", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Midrand"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:15."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:15.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:15."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/midrand#webpage", "url": "https://dchub.cloud/markets/midrand", "name": "Midrand data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Midrand data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Midrand market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Midrand data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Midrand market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
