description: Is Midlothian a good data center market for power? DCPI verdict CAUTION, score 45.5/100 (ERCOT), as of 2026-11-12. 425 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Midlothian data centers: power, grid and capacity | DC Hub"
---

# Midlothian data center market

Power availability in Midlothian: DCPI verdict CAUTION, composite score 45.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 188 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Midlothian data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Midlothian market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**45.5/100**

MW, all listings**425**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**CAUTION**

## Midlothian at a glance

Midlothian has 300 MW operational and 125 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (425 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 300 |
| Under construction | 125 |
| Total listed | 425 |

## Developers building or planning in Midlothian

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Google | 125 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Midlothian

DC Hub does not hold a lease-rate figure for this market yet.

Midlothian's data center footprint spans 425 MW across four tracked facilities, with Google operating two sites and SHARKA operating one. No recent deals have been tracked in this market.

The DCPI verdict of CAUTION reflects tension between these two dimensions. Together, these scores flag that operators and developers should expect moderate difficulty securing additional capacity; power will not flow freely, but acute scarcity is not imminent.

Deal flow into Midlothian remains dormant. No transactions have been recorded recently, and operator concentration is light, with Google holding two of the four tracked facilities.

## Data centers in Midlothian

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Midlothian Data Center](https://dchub.cloud/facilities/google-google-midlothian-data-center-525728fa) | Google | Operational | 300 |
| [Google Midlothian Building 3](https://dchub.cloud/facilities/google-google-midlothian-building-3-a8a840ee) | Google | Under Construction | 125 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Midlothian

- [Midlothian DCPI score](https://dchub.cloud/dcpi/midlothian)
- [Midlothian market brief](https://dchub.cloud/markets/midlothian/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Midlothian DCPI verdict changes

Email me when Midlothian's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Midlothian: 425 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=midlothian) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=midlothian)

JSON: [/api/v1/markets/midlothian/deep-dive](https://dchub.cloud/api/v1/markets/midlothian/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Midlothian","item":"https://dchub.cloud/markets/midlothian"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Midlothian Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:11:21.826670+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/midlothian",
 "wordCount":188,
 "about":{"@type":"Place","name":"Midlothian"},
 "description":"Live data-center market analysis. DCPI score 45.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "midlothian", "name": "Midlothian Data Center Market — DC Hub", "description": "Live data-center market measurements for Midlothian, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/midlothian", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Midlothian"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 425.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 45.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:00."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:00.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:00."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/midlothian#webpage", "url": "https://dchub.cloud/markets/midlothian", "name": "Midlothian data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Midlothian data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Midlothian market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Midlothian data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Midlothian market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```