---
description: Is Miami a good data center market for power? DCPI verdict AVOID, score 29.9/100 (FRCC), as of 2026-11-12. 15 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Miami data centers: power, grid and capacity | DC Hub"
---

# Miami data center market

Power availability in Miami: DCPI verdict AVOID, composite score 29.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Miami data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Miami market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**29.9/100**

MW, all listings**15**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Miami at a glance

Miami has 15 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Thor Equities (15 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 15 |
| Total listed | 15 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Miami

DC Hub does not hold a lease-rate figure for this market yet.

Recent coverage from USA Today and Axios has highlighted both active development and regulatory scrutiny around neighborhood-scale deployments, while Miami Herald reporting documents county-level application backlogs tied to development moratoria in adjacent jurisdictions.

The Data Center Power Index verdict of AVOID reflects a structural mismatch in Miami's power infrastructure. This combination suggests that new entrants or expansion projects should expect delays in power delivery and elevated coordination costs with Florida's regional transmission operators.

Deal flow in Miami remains dormant relative to peer markets: no recent acquisitions or capacity sales are tracked. Equinix and DataBank's presence anchors the operator base, with 3HCLOUD LLC and Volico each running two sites.

## Data centers in Miami

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Thor Miami 1](https://dchub.cloud/facilities/thor-equities-thor-miami-1-7d999ab7) | Thor Equities | Operational | 15 |
| [Cogent Boca Raton](https://dchub.cloud/facilities/cogent-communications-inc-cogent-boca-raton-5e794be2) | Cogent Communications, Inc. | Operational |  |
| [CoreSite - Miami (MI1)](https://dchub.cloud/facilities/coresite-coresite-miami-mi1-1adf2036) | CoreSite | Operational |  |
| [Digital Realty MIA (36 NE 2nd St)](https://dchub.cloud/facilities/digital-realty-digital-realty-mia-36-ne-2nd-st-ea3d3ea8) | Digital Realty | Operational |  |
| [Digital Realty MIA1 Miami](https://dchub.cloud/facilities/digital-realty-digital-realty-mia1-miami-32c9e008) | Digital Realty | Operational |  |
| [EdgeConneX Miami (EDCMIA01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-miami-edcmia01-13d094f6) | EdgeConneX Inc. | Operational |  |
| [EdgeConneX Miami (EDCMIA02)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-miami-edcmia02-62c38ceb) | EdgeConneX Inc. | Operational |  |
| [Encore Technologies MSB1](https://dchub.cloud/facilities/encore-technologies-encore-technologies-msb1-ae1c22e5) | Encore Technologies | Operational |  |
| [Equinix MI1 - Miami, NOTA](https://dchub.cloud/facilities/equinix-equinix-mi1-miami-nota-335f71ce) | Equinix | Operational |  |
| [Equinix MI2 - Miami](https://dchub.cloud/facilities/equinix-equinix-mi2-miami-d6220652) | Equinix | Operational |  |
| [Equinix MI3 - Miami, Boca Raton](https://dchub.cloud/facilities/equinix-equinix-mi3-miami-boca-raton-abe8243c) | Equinix | Operational |  |
| [Iron Mountain Data Center - Ohio (OHS-1)](https://dchub.cloud/facilities/iron-mountain-data-centers-iron-mountain-data-center-ohio-ohs-1-5054bdae) | Iron Mountain Data Centers | Operational |  |
| [Level(3) Miami (5th St)](https://dchub.cloud/facilities/lumen-technologies-level3-miami-5th-st-39815cd3) | Lumen Technologies | Operational |  |
| [MDC1 - 36 NE 2nd St](https://dchub.cloud/facilities/colocation-america-corporation-mdc1-36-ne-2nd-st-733e19a0) | Colocation America Corporation | Operational |  |
| [NAP of the Americas](https://dchub.cloud/facilities/nap-of-the-americas-nap-of-the-americas-1ab4c4d0) |  | Operational |  |
| [NWT Data Center](https://dchub.cloud/facilities/biznesshosting-inc-dba-volico-nwt-data-center-9c6736dd) | Biznesshosting, Inc. DBA VOLICO | Operational |  |
| [QTS Miami (MIA1)](https://dchub.cloud/facilities/qts-qts-miami-mia1-cc3ae39d) | QTS | Operational |  |
| [South Reach Networks](https://dchub.cloud/facilities/south-reach-networks-south-reach-networks-b27f517e) |  | Operational |  |
| [Telefonica KeyCenter](https://dchub.cloud/facilities/telefonica-keycenter-telefonica-keycenter-39d7ec70) |  | Operational |  |
| [Telxius Boca Raton DC](https://dchub.cloud/facilities/telxius-cable-telxius-boca-raton-dc-d8b332ce) | Telxius Cable | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Florida](https://dchub.cloud/facilities/in/us/florida).

## More on Miami

- [Miami DCPI score](https://dchub.cloud/dcpi/miami)
- [Miami market brief](https://dchub.cloud/markets/miami/brief)
- [Florida data center market brief](https://dchub.cloud/states/florida/brief)
- [Florida data center tax incentives](https://dchub.cloud/states/florida/data-center-incentives)

### Email me when the Miami DCPI verdict changes

Email me when Miami's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Miami: 15 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=miami) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=miami)

JSON: [/api/v1/markets/miami/deep-dive](https://dchub.cloud/api/v1/markets/miami/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Miami","item":"https://dchub.cloud/markets/miami"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Miami Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:11:12.635608+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/miami",
 "wordCount":254,
 "about":{"@type":"Place","name":"Miami"},
 "description":"Live data-center market analysis. DCPI score 29.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "miami", "name": "Miami Data Center Market — DC Hub", "description": "Live data-center market measurements for Miami, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/miami", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Miami"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 15.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 29.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:37."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:37.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:37."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/miami#webpage", "url": "https://dchub.cloud/markets/miami", "name": "Miami data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Miami data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Miami market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Miami data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Miami market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
