# Mesa data center market

Power availability in Mesa: DCPI verdict BUILD, composite score 65.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 213 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Mesa data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Mesa market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**65.7/100**

MW, all listings**1,425**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Mesa at a glance

Mesa has 775 MW operational and 370 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are EdgeCore Digital Infrastructure (344 MW), Meta (280 MW) and Google (200 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 775 |
| Under construction | 370 |
| Total listed | 1,145 |

## Developers building or planning in Mesa

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| EdgeCore Digital Infrastructure | 144 |  |
| Novva Data Centers | 96 |  |
| Meta | 80 |  |
| Google | 50 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Mesa

DC Hub does not hold a lease-rate figure for this market yet.

EdgeCore Digital Infrastructure and EdgeCore operate four facilities each, while Meta operates three. No recent deal activity has been recorded in the market.

Deal flow in Mesa remains absent from recent transaction records, a pattern consistent with neighboring Arizona markets where internal capital and build-to-suit strategies dominate over third-party M&A. This concentration does not indicate market maturity or saturation; rather, it reflects early-stage geography where established players have staked positions while transaction volume remains light.

Political scrutiny around data center expansion in Arizona will likely shape Mesa's development pace and permitting environment going forward.

## Data centers in Mesa

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [EdgeCore Mesa Campus PH01](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-mesa-campus-ph01-54e3fad5) | EdgeCore Digital Infrastructure | Operational | 200 |
| [Meta Phoenix DC](https://dchub.cloud/facilities/meta-meta-phoenix-dc-647dbd3b) | Meta | Operational | 200 |
| [Google Mesa](https://dchub.cloud/facilities/google-google-mesa-51ea53e4) | Google | Operational | 150 |
| [Compass Mesa Arizona](https://dchub.cloud/facilities/compass-datacenters-compass-mesa-arizona-ac6edae6) | Compass Datacenters | Operational | 120 |
| [Novva Project Borealis Phase 1](https://dchub.cloud/facilities/novva-data-centers-novva-project-borealis-phase-1-b446777d) | Novva Data Centers | Under Construction | 96 |
| [EdgeCore Mesa Campus PH02](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-mesa-campus-ph02-9eb8934c) | EdgeCore Digital Infrastructure | Under Construction | 72 |
| [EdgeCore Mesa Campus PH03](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-mesa-campus-ph03-54c69f61) | EdgeCore Digital Infrastructure | Under Construction | 72 |
| [EdgeCore Mesa](https://dchub.cloud/facilities/edgecore-edgecore-mesa-ae478246) | EdgeCore | Operational | 65 |
| [Google Mesa Building 3](https://dchub.cloud/facilities/google-google-mesa-building-3-c717cb39) | Google | Under Construction | 50 |
| [Form8tion Phoenix 1](https://dchub.cloud/facilities/form8tion-form8tion-phoenix-1-689b803a) | Form8tion | Operational | 40 |
| [Meta Mesa Building 4](https://dchub.cloud/facilities/meta-meta-mesa-building-4-256b832f) | Meta | Under Construction | 40 |
| [Meta Mesa Building 5](https://dchub.cloud/facilities/meta-meta-mesa-building-5-eb1fe2a1) | Meta | Under Construction | 40 |
| [Alliance Technology](https://dchub.cloud/facilities/alliance-technology-alliance-technology-d7dad5d4) |  | Operational |  |
| [Apple Data Center](https://dchub.cloud/facilities/apple-inc-apple-data-center-1bcec35d) | Apple Inc. | Operational |  |
| [Apple Mesa AZ Campus](https://dchub.cloud/facilities/apple-apple-mesa-az-campus-b5445ef5) | Apple | Operational |  |
| [Centersquare Phoenix (PHX3)](https://dchub.cloud/facilities/centersquare-centersquare-phoenix-phx3-318e4b78) | Centersquare | Operational |  |
| [Centersquare: Phoenix - (PHX1 - Mesa)](https://dchub.cloud/facilities/centersquare-centersquare-phoenix-phx1-mesa-1a17caf2) | Centersquare | Operational |  |
| [EdgeConneX PHX02 Data Center](https://dchub.cloud/facilities/edgeconnex-edgeconnex-phx02-data-center-46b1140b) | EdgeConneX | Operational |  |
| [EdgeCore Mesa AZ](https://dchub.cloud/facilities/edgecore-edgecore-mesa-az-491f6580) | EdgeCore | Operational |  |
| [EdgeCore Phoenix](https://dchub.cloud/facilities/edgecore-digital-infrastructure-edgecore-phoenix-a5ccd55f) | EdgeCore Digital Infrastructure | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Mesa

- [Mesa DCPI score](https://dchub.cloud/dcpi/mesa)
- [Mesa market brief](https://dchub.cloud/markets/mesa/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Mesa DCPI verdict changes

Email me when Mesa's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Mesa: 1,425 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=mesa) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=mesa)

JSON: [/api/v1/markets/mesa/deep-dive](https://dchub.cloud/api/v1/markets/mesa/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Mesa","item":"https://dchub.cloud/markets/mesa"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Mesa Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:11:03.318603+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/mesa",
 "wordCount":213,
 "about":{"@type":"Place","name":"Mesa"},
 "description":"Live data-center market analysis. DCPI score 65.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "mesa", "name": "Mesa Data Center Market — DC Hub", "description": "Live data-center market measurements for Mesa, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/mesa", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Mesa"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1425.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 65.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:24."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:24.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:24."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/mesa#webpage", "url": "https://dchub.cloud/markets/mesa", "name": "Mesa data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Mesa data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Mesa market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Mesa data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Mesa market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```