---
description: Is McLean a good data center market for power? DCPI verdict AVOID, score 22.3/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "McLean data centers: power, grid and capacity | DC Hub"
---

# McLean data center market

Power availability in McLean: DCPI verdict AVOID, composite score 22.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 235 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the McLean data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the McLean market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in McLean

DC Hub does not hold a lease-rate figure for this market yet.

DataBank operates two facilities, while EQUINIX LLC and Equinix together account for two additional locations, and a second Lumen entity holds one site. The market shows fragmented control with no single dominant operator, and no recent transaction activity has been recorded in the deal registry.

This is not a reflection of market quality or demand, but rather a forward signal about the practical difficulty and likely cost of acquiring new power supply in the near term.

No recent deals have been tracked in McLean, and operator composition suggests a mature, stable market rather than one experiencing active consolidation or entry. The three Lumen entities indicate legacy telecom infrastructure ownership, while DataBank and Equinix represent colocation specialists with regional presence.

## Data centers in McLean

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Level(3) McLean](https://dchub.cloud/facilities/lumen-technologies-level3-mclean-72f1dc3b) | Lumen Technologies | Operational |  |
| [Lumen McLean](https://dchub.cloud/facilities/lumen-technologies-lumen-mclean-1f87b1e9) | Lumen Technologies | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on McLean

- [McLean DCPI score](https://dchub.cloud/dcpi/mclean)
- [McLean market brief](https://dchub.cloud/markets/mclean/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the McLean DCPI verdict changes

Email me when McLean's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

McLean market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=mclean) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=mclean)

JSON: [/api/v1/markets/mclean/deep-dive](https://dchub.cloud/api/v1/markets/mclean/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Mclean","item":"https://dchub.cloud/markets/mclean"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"McLean Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:10:14.533418+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/mclean",
 "wordCount":235,
 "about":{"@type":"Place","name":"McLean"},
 "description":"Live data-center market analysis. DCPI score 22.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "mclean", "name": "McLean Data Center Market — DC Hub", "description": "Live data-center market measurements for McLean, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/mclean", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "McLean"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:25."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:25.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:25."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/mclean#webpage", "url": "https://dchub.cloud/markets/mclean", "name": "McLean data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the McLean data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the McLean market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the McLean data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the McLean market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
