# Mason data center market

Power availability in Mason: DCPI verdict AVOID, composite score 20.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 186 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Mason data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Mason market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Mason

DC Hub does not hold a lease-rate figure for this market yet.

No recent power or capacity deals have been tracked in this market, and individual facility megawattage reporting remains minimal.

Together these metrics suggest that new build projects or major expansions would face material friction in acquiring incremental supply. The combination reflects a market where available power is neither abundant nor severely restricted, but where procurement would require direct engagement with incumbent operators or utilities and cannot be assumed.

CyrusOne's dual presence in the market establishes operator concentration typical of smaller regional hubs. This does not reflect market quality or demand, but rather signals low transactional visibility in publicly reported data center activity for Mason specifically.

Forward planning should account for Mason's position within the broader Ohio regional ecosystem, where larger metropolitan markets have attracted more substantial hyperscaler and institutional investment.

## Data centers in Mason

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CyrusOne Cincinnati-Mason CIN3](https://dchub.cloud/facilities/cyrusone-cyrusone-cincinnati-mason-cin3-453dabc9) | CyrusOne | Operational |  |
| [CyrusOne Mason](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-mason-17922b6e) | CyrusOne Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Ohio](https://dchub.cloud/facilities/in/us/ohio).

## More on Mason

- [Mason DCPI score](https://dchub.cloud/dcpi/mason)
- [Mason market brief](https://dchub.cloud/markets/mason/brief)
- [Ohio data center market brief](https://dchub.cloud/states/ohio/brief)
- [Ohio data center tax incentives](https://dchub.cloud/states/ohio/data-center-incentives)

### Email me when the Mason DCPI verdict changes

Email me when Mason's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Mason market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=mason) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=mason)

JSON: [/api/v1/markets/mason/deep-dive](https://dchub.cloud/api/v1/markets/mason/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Mason","item":"https://dchub.cloud/markets/mason"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Mason Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T09:02:31.935272+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/mason",
 "wordCount":186,
 "about":{"@type":"Place","name":"Mason"},
 "description":"Live data-center market analysis. DCPI score 20.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "mason", "name": "Mason Data Center Market — DC Hub", "description": "Live data-center market measurements for Mason, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/mason", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Mason"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:44."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:44.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:44."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/mason#webpage", "url": "https://dchub.cloud/markets/mason", "name": "Mason data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Mason data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Mason market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Mason data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Mason market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```