---
description: Is Marseille a good data center market for power? DCPI verdict AVOID, score 22.1/100 (ENTSOE-FR), as of 2026-11-12. 52 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Marseille data centers: power, grid and capacity | DC Hub"
---

# Marseille data center market

Power availability in Marseille: DCPI verdict AVOID, composite score 22.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 209 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Marseille data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Marseille market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.1/100**

MW, all listings**52**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Marseille at a glance

Marseille has 52 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (42 MW), Free Pro (Ex. Jaguar Network - DCForData) (5 MW) and Verizon (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 52 |
| Total listed | 52 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Marseille

DC Hub does not hold a lease-rate figure for this market yet.

The remaining 32 tracked sites are distributed among smaller operators including Asp Serveur La Ciotat, Colt Technology Services Marseille, and Aix-Marseille Université. No recent deals have been tracked in this market.

Combined, these metrics suggest that securing new power allocations will require substantive grid coordination and that power availability is not a reliable foundation for new development timelines.

Operator concentration around Digital Realty and Orange suggests established players have locked in historical allocations, leaving limited flexibility for new entrants or greenfield projects.

Forward momentum depends on whether French grid operators prioritize Marseille's data center infrastructure in their regional reinforcement roadmap, particularly given broader grid connection discussions affecting French data centers more broadly.

## Data centers in Marseille

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty MRS2](https://dchub.cloud/facilities/digital-realty-digital-realty-mrs2-f661d48d) | Digital Realty | Operational | 14 |
| [Digital Realty MRS3](https://dchub.cloud/facilities/digital-realty-digital-realty-mrs3-867b99ac) | Digital Realty | Operational | 14 |
| [Digital Realty MRS4](https://dchub.cloud/facilities/digital-realty-digital-realty-mrs4-34efea0f) | Digital Realty | Operational | 14 |
| [Free Pro - Datacenter Marseille (MAR02)](https://dchub.cloud/facilities/free-pro-ex-jaguar-network-dcfordata-free-pro-datacenter-marseille-mar02-7ef4d494) | Free Pro (Ex. Jaguar Network - DCForData) | Operational | 5 |
| [Verizon Marseille](https://dchub.cloud/facilities/verizon-verizon-marseille-19d0fe1d) | Verizon | Operational | 5 |
| [Azure France South Marseille](https://dchub.cloud/facilities/microsoft-azure-france-south-marseille-54daf7ca) | Microsoft | Operational |  |
| [Digital Realty MRS1 Marseille](https://dchub.cloud/facilities/digital-realty-digital-realty-mrs1-marseille-ccf35564) | Digital Realty | Operational |  |
| [EXA Edge DC Marseille](https://dchub.cloud/facilities/exa-infrastructure-exa-edge-dc-marseille-64df93b0) | EXA Infrastructure | Operational |  |
| [Marseille](https://dchub.cloud/facilities/digital-realty-marseille-ca165e8b) | Digital Realty | Operational |  |
| [Oracle Cloud France Marseille](https://dchub.cloud/facilities/oracle-oracle-cloud-france-marseille-5f0d520b) | Oracle | Operational |  |
| [Phocea DC](https://dchub.cloud/facilities/phocea-dc-phocea-dc-300a86fc) |  | Operational |  |
| [dc2scale MRS1 (Marseille datacenter)](https://dchub.cloud/facilities/dc2scale-sas-dc2scale-mrs1-marseille-datacenter-2e89214c) | dc2scale SAS | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [France](https://dchub.cloud/facilities/in/fr).

## More on Marseille

- [Marseille DCPI score](https://dchub.cloud/dcpi/marseille)
- [Marseille market brief](https://dchub.cloud/markets/marseille/brief)

### Email me when the Marseille DCPI verdict changes

Email me when Marseille's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Marseille: 52 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=marseille) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=marseille)

JSON: [/api/v1/markets/marseille/deep-dive](https://dchub.cloud/api/v1/markets/marseille/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Marseille","item":"https://dchub.cloud/markets/marseille"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Marseille Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:50.976296+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/marseille",
 "wordCount":209,
 "about":{"@type":"Place","name":"Marseille"},
 "description":"Live data-center market analysis. DCPI score 22.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "marseille", "name": "Marseille Data Center Market — DC Hub", "description": "Live data-center market measurements for Marseille, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/marseille", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Marseille"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 52.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:19."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:19.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:19."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/marseille#webpage", "url": "https://dchub.cloud/markets/marseille", "name": "Marseille data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Marseille data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Marseille market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Marseille data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Marseille market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
