Power availability in Marlborough: DCPI verdict AVOID, composite score 32.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 276 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Marlborough data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Marlborough market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Marlborough

DC Hub does not hold a lease-rate figure for this market yet.

The DCPI verdict of AVOID signals that operators and site developers should expect difficulty securing new power allocations in Marlborough. New colocation or hyperscale buildout here would require either negotiation for retired or underutilized capacity within existing facilities, or pursuit of new interconnection agreements with local utilities—both costly and time-intensive in a market already running tight on supply.

Deal flow in Marlborough has stopped. No recent transactions have been tracked, which aligns with rational operator behavior in a power-capped market. When spare capacity is this scarce and procurement friction is this high, neither facility acquisitions nor new construction announcements materialize.

Marlborough's power situation will likely remain under pressure until either local utility infrastructure expands or anchor demand in the market declines enough to free capacity.

## Data centers in Marlborough

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [BDC1 - 34 Saint Martin Dr](https://dchub.cloud/facilities/colocation-america-corporation-bdc1-34-saint-martin-dr-838d851a) | Colocation America Corporation | Operational |  |
| [TierPoint Boston - Marlborough](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-boston-marlborough-0079afd0) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Massachusetts](https://dchub.cloud/facilities/in/us/massachusetts).

## More on Marlborough

- [Marlborough DCPI score](https://dchub.cloud/dcpi/marlborough)
- [Marlborough market brief](https://dchub.cloud/markets/marlborough/brief)
- [Massachusetts data center market brief](https://dchub.cloud/states/massachusetts/brief)
- [Massachusetts data center tax incentives](https://dchub.cloud/states/massachusetts/data-center-incentives)

### Email me when the Marlborough DCPI verdict changes

Email me when Marlborough's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Marlborough market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=marlborough) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=marlborough)

JSON: [/api/v1/markets/marlborough/deep-dive](https://dchub.cloud/api/v1/markets/marlborough/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Marlborough","item":"https://dchub.cloud/markets/marlborough"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Marlborough Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:43.790824+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/marlborough",
 "wordCount":276,
 "about":{"@type":"Place","name":"Marlborough"},
 "description":"Live data-center market analysis. DCPI score 32.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "marlborough", "name": "Marlborough Data Center Market — DC Hub", "description": "Live data-center market measurements for Marlborough, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/marlborough", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Marlborough"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:45."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:45.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:45."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/marlborough#webpage", "url": "https://dchub.cloud/markets/marlborough", "name": "Marlborough data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Marlborough data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Marlborough market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Marlborough data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Marlborough market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```