---
description: Is Markham a good data center market for power? DCPI verdict AVOID, score 24.6/100 (IESO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Markham data centers: power, grid and capacity | DC Hub"
---

# Markham data center market

Power availability in Markham: DCPI verdict AVOID, composite score 24.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 260 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Markham data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Markham market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Markham

DC Hub does not hold a lease-rate figure for this market yet.

The market's supply position reflects a mature, operator-dominated landscape where consolidation among top players has stabilized the active portfolio. Individual facility power capacity reporting remains sparse—only one tracked site has submitted megawatt data—limiting visibility into actual load distribution across the market.

This configuration leaves prospective operators with few levers to unlock additional supply without substantial lead time or infrastructure negotiation.

No recent deals tracked in Markham align with broader momentum visible in adjacent Ontario markets. Ontario's government unveiled a new data center framework aimed at attracting industry investment with "meaningful benefits" for local stakeholders, signaling policy-level appetite for the sector. These signals suggest capital is moving within the province, though Markham's deal pipeline shows no recorded transactions. The absence of tracked deal flow does not indicate market stagnation but reflects either discrete operator-to-operator activity below public notice thresholds or a tactical pause pending clarity on power availability.

Markham's power and supply dynamics will likely remain tightly bound to utility infrastructure upgrades and provincial grid planning cycles through 2026.

## Data centers in Markham

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Centersquare Toronto (YYZ2)](https://dchub.cloud/facilities/centersquare-centersquare-toronto-yyz2-dcf8b7f9) | Centersquare | Operational |  |
| [Digital Realty YYZ10 Toronto (371 Gough)](https://dchub.cloud/facilities/digital-realty-digital-realty-yyz10-toronto-371-gough-63da1d81) | Digital Realty | Operational |  |
| [Rogers Data Center](https://dchub.cloud/facilities/rogers-data-center-874a585b) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Canada](https://dchub.cloud/facilities/in/ca).

## More on Markham

- [Markham DCPI score](https://dchub.cloud/dcpi/markham)
- [Markham market brief](https://dchub.cloud/markets/markham/brief)

### Email me when the Markham DCPI verdict changes

Email me when Markham's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Markham market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=markham) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=markham)

JSON: [/api/v1/markets/markham/deep-dive](https://dchub.cloud/api/v1/markets/markham/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Markham","item":"https://dchub.cloud/markets/markham"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Markham Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:35.722044+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/markham",
 "wordCount":260,
 "about":{"@type":"Place","name":"Markham"},
 "description":"Live data-center market analysis. DCPI score 24.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "markham", "name": "Markham Data Center Market — DC Hub", "description": "Live data-center market measurements for Markham, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/markham", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Markham"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:12."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:12.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:12."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/markham#webpage", "url": "https://dchub.cloud/markets/markham", "name": "Markham data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Markham data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Markham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Markham data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Markham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
