---
description: Is Marietta a good data center market for power? DCPI verdict AVOID, score 24.0/100 (SOCO), as of 2026-11-12. 18 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Marietta data centers: power, grid and capacity | DC Hub"
---

# Marietta data center market

Power availability in Marietta: DCPI verdict AVOID, composite score 24 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 209 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Marietta data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Marietta market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.0/100**

MW, all listings**18**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Marietta

DC Hub does not hold a lease-rate figure for this market yet.

Marietta hosts four tracked facilities operated by CoreSite, PhoenixNAP, Prime, and datasite, with municipal zoning approval secured for at least two data center projects after contentious city council votes. Recent council actions indicate local willingness to accommodate sector growth, though debate has been heated enough to require multiple votes and extended deliberation. Only one facility in the tracked portfolio currently reports megawatt capacity to DC Hub, limiting visibility into the market's aggregate footprint and operational scale.

Deal flow into Marietta remains dormant; no recent transactions have been tracked in this market. Operator concentration is low, and no single entity controls material capacity.

## Data centers in Marietta

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CoreSite - Atlanta (AT2)](https://dchub.cloud/facilities/coresite-coresite-atlanta-at2-7bd42406) | CoreSite | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Georgia](https://dchub.cloud/facilities/in/us/georgia).

## More on Marietta

- [Marietta DCPI score](https://dchub.cloud/dcpi/marietta)
- [Marietta market brief](https://dchub.cloud/markets/marietta/brief)
- [Georgia data center market brief](https://dchub.cloud/states/georgia/brief)
- [Georgia data center tax incentives](https://dchub.cloud/states/georgia/data-center-incentives)

### Email me when the Marietta DCPI verdict changes

Email me when Marietta's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Marietta: 18 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=marietta) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=marietta)

JSON: [/api/v1/markets/marietta/deep-dive](https://dchub.cloud/api/v1/markets/marietta/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Marietta","item":"https://dchub.cloud/markets/marietta"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Marietta Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:27.537156+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/marietta",
 "wordCount":209,
 "about":{"@type":"Place","name":"Marietta"},
 "description":"Live data-center market analysis. DCPI score 24.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "marietta", "name": "Marietta Data Center Market — DC Hub", "description": "Live data-center market measurements for Marietta, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/marietta", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Marietta"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 18.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:24."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:24.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:24."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/marietta#webpage", "url": "https://dchub.cloud/markets/marietta", "name": "Marietta data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Marietta data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Marietta market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Marietta data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Marietta market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
