---
description: Is Manila a good data center market for power? DCPI verdict AVOID, score 21.7/100 (NGCP), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Manila data centers: power, grid and capacity | DC Hub"
---

# Manila data center market

Power availability in Manila: DCPI verdict AVOID, composite score 21.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 247 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Manila data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Manila market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.7/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Manila

DC Hub does not hold a lease-rate figure for this market yet.

The market lacks transparency on aggregate capacity, with only one facility reporting megawatt figures to tracking systems. This operational atomization reflects Manila's position as a secondary hub within Southeast Asia's data center ecosystem, where infrastructure development continues but without the scale consolidation seen in regional peers.

The DCPI verdict of AVOID signals material friction in new power procurement.

Recent deal flow in Manila itself remains absent from tracked records, though the broader Philippine market has attracted attention. AIB Data Centers completed an acquisition that nearly doubled its contracted power capacity to 120 MW, signaling appetite for scale in the archipelago. Operator presence remains stable but static, with no recent facility entries or exits among the five incumbents.

## Data centers in Manila

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Converge ICT Manila DC](https://dchub.cloud/facilities/converge-ict-converge-ict-manila-dc-bb47e664) | Converge ICT | Operational |  |
| [Manila](https://dchub.cloud/facilities/equinix-manila-a6505074) | Equinix | Operational |  |
| [PLDT Vitro Makati](https://dchub.cloud/facilities/pldt-pldt-vitro-makati-09959fa1) | PLDT | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Philippines](https://dchub.cloud/facilities/in/ph).

## More on Manila

- [Manila DCPI score](https://dchub.cloud/dcpi/manila)
- [Manila market brief](https://dchub.cloud/markets/manila/brief)

### Email me when the Manila DCPI verdict changes

Email me when Manila's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Manila market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=manila) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=manila)

JSON: [/api/v1/markets/manila/deep-dive](https://dchub.cloud/api/v1/markets/manila/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Manila","item":"https://dchub.cloud/markets/manila"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Manila Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:20.304854+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/manila",
 "wordCount":247,
 "about":{"@type":"Place","name":"Manila"},
 "description":"Live data-center market analysis. DCPI score 21.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "manila", "name": "Manila Data Center Market — DC Hub", "description": "Live data-center market measurements for Manila, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/manila", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Manila"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:05."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:05.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:05."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/manila#webpage", "url": "https://dchub.cloud/markets/manila", "name": "Manila data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Manila data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Manila market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Manila data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Manila market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
