---
description: Is Manchester a good data center market for power? DCPI verdict AVOID, score 12.8/100 (NGESO), as of 2026-11-12. 18 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Manchester data centers: power, grid and capacity | DC Hub"
---

# Manchester data center market

Power availability in Manchester: DCPI verdict AVOID, composite score 12.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 280 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Manchester data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Manchester market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**12.8/100**

MW, all listings**18**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Manchester at a glance

Manchester has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (18 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 18 |
| Total listed | 18 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Manchester

DC Hub does not hold a lease-rate figure for this market yet.

One tracked facility reports power consumption data, though aggregate capacity figures are not disclosed. Recent activity includes Volta's acquisition of Reynolds House, a former Telecity/Equinix site acquired from Lunar Digital, signaling asset transitions within the established operator base.

No recent deals tracked in this reporting period. Volta's earlier acquisition of the Reynolds House site represents one of the more material recent transactions. Separately, edge infrastructure proposals for AI workloads have been publicly mooted for Manchester, framed as part of a planned edge network, though these remain in proposal phase. The operator base remains concentrated among established colocation players and regional providers with no tracked new entrants or greenfield announcements in the current cycle.

Forward momentum depends on grid reinforcement beyond current visibility: Manchester's power supply profile constrains new deployments more than most UK markets, and operators scoping capacity additions should validate grid upgrade timelines with local distribution network operators before committing to site selection.

## Data centers in Manchester

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Joule House](https://dchub.cloud/facilities/equinix-joule-house-4a881727) | Equinix | Operational | 18 |
| [Equinix MA1 - Manchester, Williams/Kilburn](https://dchub.cloud/facilities/equinix-equinix-ma1-manchester-williamskilburn-711595c2) | Equinix | Operational |  |
| [Equinix MA3 - Manchester, Joule House](https://dchub.cloud/facilities/equinix-equinix-ma3-manchester-joule-house-a973770c) | Equinix | Operational |  |
| [Equinix MA4 - Manchester, Synergy House](https://dchub.cloud/facilities/equinix-equinix-ma4-manchester-synergy-house-41b703b3) | Equinix | Operational |  |
| [Volta Manchester](https://dchub.cloud/facilities/lunar-digital-solutions-limited-reynolds-house-manchester-d62aa00e) | Lunar Digital Solutions Limited | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [United Kingdom](https://dchub.cloud/facilities/in/gb).

## More on Manchester

- [Manchester DCPI score](https://dchub.cloud/dcpi/manchester)
- [Manchester market brief](https://dchub.cloud/markets/manchester/brief)

### Email me when the Manchester DCPI verdict changes

Email me when Manchester's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Manchester: 18 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=manchester) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=manchester)

JSON: [/api/v1/markets/manchester/deep-dive](https://dchub.cloud/api/v1/markets/manchester/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Manchester","item":"https://dchub.cloud/markets/manchester"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Manchester Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:11.483678+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/manchester",
 "wordCount":280,
 "about":{"@type":"Place","name":"Manchester"},
 "description":"Live data-center market analysis. DCPI score 12.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "manchester", "name": "Manchester Data Center Market — DC Hub", "description": "Live data-center market measurements for Manchester, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/manchester", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Manchester"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 18.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 12.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:16."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:16.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:16."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/manchester#webpage", "url": "https://dchub.cloud/markets/manchester", "name": "Manchester data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Manchester data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Manchester market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Manchester data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Manchester market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
