# Manassas data center market

Power availability in Manassas: DCPI verdict AVOID, composite score 20.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 278 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Manassas data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Manassas market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.4/100**

MW, all listings**1,261**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Manassas at a glance

Manassas has 868 MW operational and 200 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Amazon Web Services (800 MW), STACK Infrastructure (200 MW) and COPT (48 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 868 |
| Under construction | 200 |
| Total listed | 1,068 |

## Developers building or planning in Manassas

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| STACK Infrastructure | 200 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Manassas

DC Hub does not hold a lease-rate figure for this market yet.

The market reflects heavy concentration among a small number of operators, with no recent deal activity recorded in the tracking window.

These readings suggest that operators seeking to expand or add capacity in Manassas will face elevated barriers to securing new power resources, whether through grid expansion, on-site generation, or power purchase agreements.

Deal flow into Manassas has stalled. No recent deals appear in the current tracking window, contrasting with broader Virginia activity where major operators have moved capital into other nodes. The absence of announced transactions does not indicate market weakness; rather, it reflects that the primary growth phase in Manassas may have concluded, leaving the market in a steady-state operational configuration dominated by a single tenant ecosystem.

## Data centers in Manassas

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [STACK NVA05 Campus](https://dchub.cloud/facilities/stack-infrastructure-stack-nva05-campus-73ee6ead) | STACK Infrastructure | Under Construction | 200 |
| [AWS IAD104](https://dchub.cloud/facilities/amazon-web-services-aws-iad104-8df73678) | Amazon Web Services | Operational | 50 |
| [AWS IAD105](https://dchub.cloud/facilities/amazon-web-services-aws-iad105-f4911696) | Amazon Web Services | Operational | 50 |
| [Amazon IAD100](https://dchub.cloud/facilities/amazon-web-services-amazon-iad100-6c8c2544) | Amazon Web Services | Operational | 50 |
| [Amazon IAD101](https://dchub.cloud/facilities/amazon-web-services-amazon-iad101-36e6e214) | Amazon Web Services | Operational | 50 |
| [Amazon IAD102](https://dchub.cloud/facilities/amazon-web-services-amazon-iad102-14de44cc) | Amazon Web Services | Operational | 50 |
| [Amazon IAD11](https://dchub.cloud/facilities/amazon-web-services-amazon-iad11-3cbc1800) | Amazon Web Services | Operational | 50 |
| [Amazon IAD130](https://dchub.cloud/facilities/amazon-web-services-amazon-iad130-a8728e94) | Amazon Web Services | Operational | 50 |
| [Amazon IAD131](https://dchub.cloud/facilities/amazon-web-services-amazon-iad131-c97d7476) | Amazon Web Services | Operational | 50 |
| [Amazon IAD14](https://dchub.cloud/facilities/amazon-web-services-amazon-iad14-bd114470) | Amazon Web Services | Operational | 50 |
| [Amazon IAD52](https://dchub.cloud/facilities/amazon-web-services-amazon-iad52-b37ad2c4) | Amazon Web Services | Operational | 50 |
| [Amazon IAD59](https://dchub.cloud/facilities/amazon-web-services-amazon-iad59-b5a2ffd1) | Amazon Web Services | Operational | 50 |
| [Amazon IAD7](https://dchub.cloud/facilities/amazon-web-services-amazon-iad7-7e1a7aea) | Amazon Web Services | Operational | 50 |
| [Amazon IAD73](https://dchub.cloud/facilities/amazon-web-services-amazon-iad73-caa38d8d) | Amazon Web Services | Operational | 50 |
| [Amazon IAD74](https://dchub.cloud/facilities/amazon-web-services-amazon-iad74-3bb73be4) | Amazon Web Services | Operational | 50 |
| [COPT Data Center Bldg 2](https://dchub.cloud/facilities/amazon-web-services-copt-data-center-bldg-2-caf1d132) | Amazon Web Services | Operational | 50 |
| [COPT Innovation Park Data Center](https://dchub.cloud/facilities/amazon-web-services-copt-innovation-park-data-center-cabcbaf7) | Amazon Web Services | Operational | 50 |
| [COPT VA-4](https://dchub.cloud/facilities/copt-copt-va-4-3ce7788a) | COPT | Operational | 48 |
| [Amazon Web Services](https://dchub.cloud/facilities/amazon-iad85-amazon-web-services-cb1aff12) | Amazon IAD85 | Operational | 5 |
| [QTS Manassas DC1](https://dchub.cloud/facilities/quality-technology-services-qts-manassas-dc1-85f5e264) | Quality Technology Services | Operational | 5 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Manassas

- [Manassas DCPI score](https://dchub.cloud/dcpi/manassas)
- [Manassas market brief](https://dchub.cloud/markets/manassas/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Manassas DCPI verdict changes

Email me when Manassas's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Manassas: 1,261 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=manassas) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=manassas)

JSON: [/api/v1/markets/manassas/deep-dive](https://dchub.cloud/api/v1/markets/manassas/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Manassas","item":"https://dchub.cloud/markets/manassas"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Manassas Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:09:03.767275+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/manassas",
 "wordCount":278,
 "about":{"@type":"Place","name":"Manassas"},
 "description":"Live data-center market analysis. DCPI score 20.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "manassas", "name": "Manassas Data Center Market — DC Hub", "description": "Live data-center market measurements for Manassas, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/manassas", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Manassas"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1261.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:11."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:11.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:11."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/manassas#webpage", "url": "https://dchub.cloud/markets/manassas", "name": "Manassas data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Manassas data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Manassas market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Manassas data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Manassas market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```