description: Is Madrid a good data center market for power? DCPI verdict AVOID, score 18.6/100 (ENTSOE-ES), as of 2026-11-12. 175 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Madrid data centers: power, grid and capacity | DC Hub"
---

# Madrid data center market

Power availability in Madrid: DCPI verdict AVOID, composite score 18.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 268 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Madrid data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Madrid market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**18.6/100**

MW, all listings**175**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Madrid at a glance

Madrid has 15 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Interxion (15 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 15 |
| Total listed | 15 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Madrid

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty leads with four locations, followed by Asociación ESpanix, Equinix, Aire Networks del Mediterraneo, and AtlasEdge with three, three, two, and two facilities respectively. The market reflects consolidation among tier-one operators, with no single entity dominating a particularly large share of the modest regional footprint.

This scoring suggests that obtaining new power connections—whether through grid expansion or alternative supply arrangements—will face material headwinds.

Deal activity centers on capacity expansion rather than ownership transfers. Nabiax announced a €870 million investment commitment targeting growth from 35 MW to 140 MW across its Madrid campus, signaling confidence in long-term operations despite grid limitations. Separately, Global Switch has begun construction on a second Madrid facility projected to add 56 MW. These projects suggest operators are pursuing organic growth strategies within existing footprints rather than competing for new greenfield entitlements. The concentration of activity among established regional players indicates that entry barriers—likely including power procurement complexity—remain high for new market participants.

Pending power availability improvements or grid upgrades, expansion projects already in motion will continue absorbing available supply-side flexibility in Madrid.

## Data centers in Madrid

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Interxion MAD1](https://dchub.cloud/facilities/interxion-interxion-mad1-067d126c) | Interxion | Operational | 15 |
| [Azure Spain Central Madrid](https://dchub.cloud/facilities/microsoft-azure-spain-central-madrid-3998e410) | Microsoft | Operational |  |
| [Cogent Madrid](https://dchub.cloud/facilities/cogent-communications-inc-cogent-madrid-c11dc6f2) | Cogent Communications, Inc. | Operational |  |
| [CyrusOne Madrid 1](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-madrid-1-49a44b4a) | CyrusOne Inc. | Operational |  |
| [Digital Realty Madrid MAD1-2](https://dchub.cloud/facilities/digital-realty-digital-realty-madrid-mad1-2-baef7655) | Digital Realty | Operational |  |
| [Digital Realty Madrid MAD3](https://dchub.cloud/facilities/digital-realty-digital-realty-madrid-mad3-dedfbc3b) | Digital Realty | Operational |  |
| [Digital Realty Madrid MAD4](https://dchub.cloud/facilities/digital-realty-digital-realty-madrid-mad4-507d6033) | Digital Realty | Operational |  |
| [Equinix MD6](https://dchub.cloud/facilities/equinix-inc-equinix-md6-6de05ce8) | Equinix, Inc. | Operational |  |
| [Global Switch Madrid](https://dchub.cloud/facilities/global-switch-global-switch-madrid-29b3b29f) | Global Switch | Operational |  |
| [Google Cloud europe-southwest1 Madrid](https://dchub.cloud/facilities/google-google-cloud-europe-southwest1-madrid-41f2bd96) | Google | Operational |  |
| [Madrid](https://dchub.cloud/facilities/digital-realty-madrid-8d64c0a4) | Digital Realty | Operational |  |
| [Templus DC Madrid MAD03](https://dchub.cloud/facilities/aire-networks-del-mediterraneo-slu-oasix-madrid-airenetworks-b14eda48) | Aire Networks del Mediterraneo S.L.U. | Operational |  |
| [Verizon Madrid](https://dchub.cloud/facilities/verizon-communications-inc-verizon-madrid-226257d5) | Verizon Communications, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Spain](https://dchub.cloud/facilities/in/es).

## More on Madrid

- [Madrid DCPI score](https://dchub.cloud/dcpi/madrid)
- [Madrid market brief](https://dchub.cloud/markets/madrid/brief)

### Email me when the Madrid DCPI verdict changes

Email me when Madrid's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Madrid: 175 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=madrid) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=madrid)

JSON: [/api/v1/markets/madrid/deep-dive](https://dchub.cloud/api/v1/markets/madrid/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Madrid","item":"https://dchub.cloud/markets/madrid"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Madrid Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:08:15.504012+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/madrid",
 "wordCount":268,
 "about":{"@type":"Place","name":"Madrid"},
 "description":"Live data-center market analysis. DCPI score 18.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "madrid", "name": "Madrid Data Center Market — DC Hub", "description": "Live data-center market measurements for Madrid, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/madrid", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Madrid"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 175.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 18.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:43."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:43.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:43."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/madrid#webpage", "url": "https://dchub.cloud/markets/madrid", "name": "Madrid data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Madrid data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Madrid market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Madrid data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Madrid market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```