---
description: Is Madison a good data center market for power? DCPI verdict CAUTION, score 49.8/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Madison data centers: power, grid and capacity | DC Hub"
---

# Madison data center market

Power availability in Madison: DCPI verdict CAUTION, composite score 49.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Madison data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Madison market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Madison

DC Hub does not hold a lease-rate figure for this market yet.

The market has recorded no recent deal activity in the tracked registry. Local regulatory attention to data center deployment has intensified; proposed rules currently prohibit hyperscale facilities within city limits, and grid protection measures have been enacted in response to rising power demand from the sector.

This combination means new power procurement in Madison will face real but not severe barriers—grid interconnection timelines, utility coordination overhead, and potential need for localized infrastructure investment should be factored into facility planning.

Operator concentration remains low, with no single entity dominating; the largest tracked players each operate one facility. No recent transactions have been recorded in this market, making operator M&A flow or capacity consolidation patterns unobservable from current data.

Regulatory zoning restrictions on hyperscale deployment and documented grid protection actions will shape facility siting and power timeline assumptions for any new development pipeline.

## Data centers in Madison

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [5Nines Data](https://dchub.cloud/facilities/5nines-data-network222-5nines-data-64aad7a6) | 5Nines Data / Network222 | Operational |  |
| [612 W Main](https://dchub.cloud/facilities/hoyos-consulting-llc-612-w-main-25fb67ab) | Hoyos Consulting LLC | Operational |  |
| [EdgeConneX Madison (EDCMAD01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-madison-edcmad01-dbcd102e) | EdgeConneX Inc. | Operational |  |
| [Lumen Madison 1 Data Center](https://dchub.cloud/facilities/lumen-technologies-lumen-madison-1-data-center-5bb6ad2a) | Lumen Technologies | Operational |  |
| [Network 222](https://dchub.cloud/facilities/fiore-companies-network-222-7352cdaa) | Fiore Companies | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Wisconsin](https://dchub.cloud/facilities/in/us/wisconsin).

## More on Madison

- [Madison DCPI score](https://dchub.cloud/dcpi/madison)
- [Madison market brief](https://dchub.cloud/markets/madison/brief)
- [Wisconsin data center market brief](https://dchub.cloud/states/wisconsin/brief)
- [Wisconsin data center tax incentives](https://dchub.cloud/states/wisconsin/data-center-incentives)

### Email me when the Madison DCPI verdict changes

Email me when Madison's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Madison market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=madison) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=madison)

JSON: [/api/v1/markets/madison/deep-dive](https://dchub.cloud/api/v1/markets/madison/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Madison","item":"https://dchub.cloud/markets/madison"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Madison Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:08:07.606140+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/madison",
 "wordCount":228,
 "about":{"@type":"Place","name":"Madison"},
 "description":"Live data-center market analysis. DCPI score 49.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "madison", "name": "Madison Data Center Market — DC Hub", "description": "Live data-center market measurements for Madison, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/madison", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Madison"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:27."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:27.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:27."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/madison#webpage", "url": "https://dchub.cloud/markets/madison", "name": "Madison data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Madison data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Madison market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Madison data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Madison market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
