---
description: Is Lynnwood a good data center market for power? DCPI verdict CAUTION, score 49.4/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Lynnwood data centers: power, grid and capacity | DC Hub"
---

# Lynnwood data center market

Power availability in Lynnwood: DCPI verdict CAUTION, composite score 49.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 268 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Lynnwood data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Lynnwood market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**49.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Lynnwood

DC Hub does not hold a lease-rate figure for this market yet.

Lynnwood hosts five tracked facilities across four operators, with no recent deal activity on record. Centersquare, Digital Fortress (operating two sites in the market), and Unity Cable System maintain the only active presences. The operator base remains stable but narrow, and no capacity figures have been reported by any tracked site.

The DCPI verdict of CAUTION reflects mixed signals on power supply dynamics.

No recent deals have been tracked in Lynnwood, and the operator roster shows no consolidation or new-entrant activity. This absence does not reflect broader Pacific Northwest hesitation—regional operators including US Signal and Sabey Data Centers have announced expansion activity in adjacent areas—but rather suggests that Lynnwood has not been the focus of recent M&A. The four-operator field is neither fragmented nor dominated; the presence of two Digital Fortress sites alongside single assets held by Centersquare and Unity Cable System indicates a distributed competitive structure.

Power procurement remains the key variable for any new project in this market: operators should expect to negotiate grid access and incremental supply at terms reflecting moderate scarcity rather than abundance, and feasibility studies should account for extended interconnection timelines.

## Data centers in Lynnwood

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Centersquare Lynnwood SE1](https://dchub.cloud/facilities/centersquare-centersquare-lynnwood-se1-5ff93be5) | Centersquare | Operational |  |
| [Digital Fortress Lynnwood](https://dchub.cloud/facilities/digital-fortress-lynnwood-digital-fortress-lynnwood-8446a1c8) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on Lynnwood

- [Lynnwood DCPI score](https://dchub.cloud/dcpi/lynnwood)
- [Lynnwood market brief](https://dchub.cloud/markets/lynnwood/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Lynnwood DCPI verdict changes

Email me when Lynnwood's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Lynnwood market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=lynnwood) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=lynnwood)

JSON: [/api/v1/markets/lynnwood/deep-dive](https://dchub.cloud/api/v1/markets/lynnwood/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Lynnwood","item":"https://dchub.cloud/markets/lynnwood"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Lynnwood Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:07:59.322989+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/lynnwood",
 "wordCount":268,
 "about":{"@type":"Place","name":"Lynnwood"},
 "description":"Live data-center market analysis. DCPI score 49.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "lynnwood", "name": "Lynnwood Data Center Market — DC Hub", "description": "Live data-center market measurements for Lynnwood, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/lynnwood", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Lynnwood"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 49.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:13."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:13.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:13."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/lynnwood#webpage", "url": "https://dchub.cloud/markets/lynnwood", "name": "Lynnwood data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Lynnwood data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Lynnwood market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Lynnwood data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Lynnwood market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
