---
description: Is Los Angeles a good data center market for power? DCPI verdict CAUTION, score 47.5/100 (CAISO), as of 2026-11-12. 303 MW tracked across all listings, unverified included (as of 2026-11-10). Grid, queue and deal context for 300+ markets.
title: "Los Angeles data centers: power, grid and capacity | DC Hub"
---

# Los Angeles data center market

Power availability in Los Angeles: DCPI verdict CAUTION, composite score 47.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Los Angeles data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Los Angeles market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.5/100**

MW, all listings**303**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Los Angeles at a glance

Los Angeles has 303 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (80 MW), Digital Realty (74 MW) and CoreSite (70 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 303 |
| Total listed | 303 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Los Angeles

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Southern California (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

No recent deal activity has been tracked in the Los Angeles market segment.

This combination signals that while additional power supply routes may exist, securing new capacity will face meaningful interconnection, transmission, or procurement friction.

Operator concentration remains moderate. Equinix's seven-site presence represents the largest single footprint but accounts for less than 3.5% of tracked facilities, underscoring the market's polyglot structure. CoreSite, Digital Realty, Colocation America Corporation, and Enzu round out the top five, each managing between four and six sites. The absence of recent deal flow prevents assessment of consolidation velocity or operator repositioning activity.

## Data centers in Los Angeles

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Equinix LA Campus](https://dchub.cloud/facilities/equinix-equinix-la-campus-17e65d44) | Equinix | Operational | 80 |
| [CoreSite LA Campus](https://dchub.cloud/facilities/coresite-coresite-la-campus-406aedcf) | CoreSite | Operational | 70 |
| [Digital Realty LAX](https://dchub.cloud/facilities/digital-realty-digital-realty-lax-d8ce9577) | Digital Realty | Operational | 60 |
| [T5@Los Angeles](https://dchub.cloud/facilities/t5-data-centers-t5los-angeles-4ffd6130) | T5 Data Centers | Operational | 45 |
| [ServerFarm Los Angeles](https://dchub.cloud/facilities/serverfarm-serverfarm-los-angeles-e3c16e25) | ServerFarm | Operational | 28 |
| [DRT LAX12](https://dchub.cloud/facilities/digital-realty-drt-lax12-c85c24ee) | Digital Realty | Operational | 14 |
| [Centurylink](https://dchub.cloud/facilities/centurylink-centurylink-d963a5a8) |  | Operational | 6 |
| [800 south hope](https://dchub.cloud/facilities/thomas-properties-group-800-south-hope-77ccd4dd) | Thomas Properties Group | Operational |  |
| [ColoCrossing LA1](https://dchub.cloud/facilities/colocrossing-colocrossing-la1-bc678fb5) | ColoCrossing | Operational |  |
| [CoreSite - Los Angeles (LA1) One Wilshire](https://dchub.cloud/facilities/coresite-coresite-los-angeles-la1-one-wilshire-b7fda5aa) | CoreSite | Operational |  |
| [CoreSite - Los Angeles (LA2)](https://dchub.cloud/facilities/coresite-coresite-los-angeles-la2-e9200b04) | CoreSite | Operational |  |
| [Crown Castle Los Angeles (624 S Grand)](https://dchub.cloud/facilities/crown-castle-inc-crown-castle-los-angeles-624-s-grand-805a7feb) | Crown Castle Inc. | Operational |  |
| [Digital Realty LAX (2260 E El Segundo)](https://dchub.cloud/facilities/digital-realty-digital-realty-lax-2260-e-el-segundo-79293853) | Digital Realty | Operational |  |
| [Digital Realty LAX (600 W 7th)](https://dchub.cloud/facilities/digital-realty-digital-realty-lax-600-w-7th-1a271753) | Digital Realty | Operational |  |
| [Digital Realty LAX39 El Segundo](https://dchub.cloud/facilities/digital-realty-digital-realty-lax39-el-segundo-b7f800e7) | Digital Realty | Operational |  |
| [Equinix LA1 - Los Angeles](https://dchub.cloud/facilities/equinix-equinix-la1-los-angeles-23cdfc9c) | Equinix | Operational |  |
| [Equinix LA2 El Segundo](https://dchub.cloud/facilities/equinix-equinix-la2-el-segundo-0692bbe5) | Equinix | Operational |  |
| [Equinix LA3/LA4 - Los Angeles, El Segundo](https://dchub.cloud/facilities/equinix-equinix-la3la4-los-angeles-el-segundo-11d377ab) | Equinix | Operational |  |
| [Equinix LA7 - Los Angeles](https://dchub.cloud/facilities/equinix-equinix-la7-los-angeles-5e3b1474) | Equinix | Operational |  |
| [Fireline Data Center](https://dchub.cloud/facilities/fireline-network-solutions-inc-fireline-data-center-99a5db4e) | Fireline Network Solutions, Inc | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Los Angeles

- [Los Angeles DCPI score](https://dchub.cloud/dcpi/los-angeles)
- [Los Angeles market brief](https://dchub.cloud/markets/los-angeles/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Los Angeles DCPI verdict changes

Email me when Los Angeles's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Los Angeles: 303 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=los-angeles) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=los-angeles)

JSON: [/api/v1/markets/los-angeles/deep-dive](https://dchub.cloud/api/v1/markets/los-angeles/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Los Angeles","item":"https://dchub.cloud/markets/los-angeles"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Los Angeles Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T05:27:15.473750+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/los-angeles",
 "wordCount":228,
 "about":{"@type":"Place","name":"Los Angeles"},
 "description":"Live data-center market analysis. DCPI score 47.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "los-angeles", "name": "Los Angeles Data Center Market — DC Hub", "description": "Live data-center market measurements for Los Angeles, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/los-angeles", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Los Angeles"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 303.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:22."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:22.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:22."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/los-angeles#webpage", "url": "https://dchub.cloud/markets/los-angeles", "name": "Los Angeles data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Los Angeles data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Los Angeles market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Los Angeles data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Los Angeles market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
