description: Is London a good data center market for power? DCPI verdict AVOID, score 10.1/100 (NGESO), as of 2026-11-12. 791 MW tracked across all listings, unverified included (as of 2026-11-10). Grid, queue and deal context for 300+ markets.
title: "London data centers: power, grid and capacity | DC Hub"
---

# London data center market

Cited by Microsoft Copilot 34 times in Bing's AI Performance report (read Oct 12, 2026). [Connect your agent](https://dchub.cloud/connect) to query this data live.

Power availability in London: DCPI verdict AVOID, composite score 10.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 269 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the London data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the London market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**10.1/100**

MW, all listings**791**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## London at a glance

London has 362 MW operational and 2 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CloudHQ (70 MW), ServerFarm (62 MW) and Global Switch (46 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 362 |
| Under construction | 2 |
| Total listed | 364 |

## Developers building or planning in London

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| ServerFarm | 2 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in London

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE Global Data Center Trends 2026, Figure 5 (Monthly Pricing for 250-to-500-kW Capacity by Market, Q1 2026): London (figure on paid plans) [(link)](https://www.cbre.com/insights/reports/global-data-center-trends-2026)

The market continues to attract development interest, with recent planning approvals including a 50,000 sqm facility in West London designated for 64 MW of electrical draw and 48 MW of IT load, and a 180 MW development proposal filed for an East London brownfield site in Charlton. Telehouse acquired a Docklands office campus with plans for a 65 MW data center adjacent to its existing London operation.

This combination indicates that grid access and power availability represent material blockers for greenfield or expanded build-out, not demand or market quality concerns. New entrants and capacity expansions should expect protracted grid connection timelines and potential need for alternative power sourcing strategies.

Recent deal flow reflects consolidation and site assembly rather than wholesale capacity transactions. Arcus executed three acquisitions with Volta on consecutive dates in early July 2026, followed by an acquisition from Verne on 9 July 2026, indicating rapid portfolio consolidation in the region. Separately, Blackstone entered a lease arrangement with an unspecified counterparty on 21 October 2026.

## Data centers in London

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CloudHQ London](https://dchub.cloud/facilities/cloudhq-cloudhq-london-c96bd563) | CloudHQ | Operational | 70 |
| [Global Switch London East](https://dchub.cloud/facilities/global-switch-global-switch-london-east-647a42a7) | Global Switch | Operational | 46 |
| [ServerFarm LON1 London](https://dchub.cloud/facilities/serverfarm-serverfarm-lon1-london-90140249) | ServerFarm | Operational | 30 |
| [ServerFarm London](https://dchub.cloud/facilities/serverfarm-serverfarm-london-7869a86b) | ServerFarm | Operational | 30 |
| [Interxion LON2](https://dchub.cloud/facilities/interxion-interxion-lon2-ed705f3c) | Interxion | Operational | 25 |
| [NTT London 1](https://dchub.cloud/facilities/ntt-ntt-london-1-1673d1d9) | NTT | Operational | 25 |
| [Interxion LON1](https://dchub.cloud/facilities/interxion-interxion-lon1-ef57dc56) | Interxion | Operational | 20 |
| [CyrusOne LON2](https://dchub.cloud/facilities/cyrusone-cyrusone-lon2-ff46ea8d) | CyrusOne | Operational | 19 |
| [Digital Realty](https://dchub.cloud/facilities/digital-realty-digital-realty-9f59866d) |  | Operational | 14 |
| [Digital Realty LHR13](https://dchub.cloud/facilities/digital-realty-digital-realty-lhr13-625ae0a4) | Digital Realty | Operational | 14 |
| [The Chess Building](https://dchub.cloud/facilities/digital-realty-the-chess-building-bfa52db0) | Digital Realty | Operational | 14 |
| [Digital Realty](https://dchub.cloud/facilities/digital-realty-london-62a4ea29) |  | Operational | 10 |
| [Braham Street Data Centre](https://dchub.cloud/facilities/level-3-communications-braham-street-data-centre-25378ab5) | Level 3 Communications | Operational | 5 |
| [Cable & Wireless Data Centre](https://dchub.cloud/facilities/cable-wireless-cable-wireless-data-centre-1ecbdbef) | Cable & Wireless | Operational | 5 |
| [Morgan Stanley](https://dchub.cloud/facilities/morgan-stanley-morgan-stanley-49a5436c) |  | Operational | 5 |
| [Pulsant South London](https://dchub.cloud/facilities/pulsant-pulsant-south-london-1625b927) | Pulsant | Operational | 5 |
| [Skyways](https://dchub.cloud/facilities/verizon-skyways-b727273a) | Verizon | Operational | 5 |
| [Telehouse East](https://dchub.cloud/facilities/telehouse-telehouse-east-0fd9eac3) | Telehouse | Operational | 5 |
| [Telehouse North](https://dchub.cloud/facilities/telehouse-telehouse-north-b903a706) | Telehouse | Operational | 5 |
| [Telehouse West](https://dchub.cloud/facilities/telehouse-telehouse-west-a1ebb02b) | Telehouse | Operational | 5 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [United Kingdom](https://dchub.cloud/facilities/in/gb).

## More on London

- [London DCPI score](https://dchub.cloud/dcpi/london)
- [London market brief](https://dchub.cloud/markets/london/brief)

### Email me when the London DCPI verdict changes

Email me when London's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

London: 791 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=london) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=london)

JSON: [/api/v1/markets/london/deep-dive](https://dchub.cloud/api/v1/markets/london/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"London","item":"https://dchub.cloud/markets/london"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"London Data Center Market Deep-Dive",
 "datePublished":"2026-11-10T09:01:45.399106+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/london",
 "wordCount":269,
 "about":{"@type":"Place","name":"London"},
 "description":"Live data-center market analysis. DCPI score 10.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "london", "name": "London Data Center Market — DC Hub", "description": "Live data-center market measurements for London, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/london", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "London"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 791.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 10.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:15."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:15.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:15."}], "dateModified": "2026-11-10", "temporalCoverage": "2026-11-10"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/london#webpage", "url": "https://dchub.cloud/markets/london", "name": "London data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the London data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the London market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the London data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the London market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```