# Little Rock data center market

Power availability in Little Rock: DCPI verdict CAUTION, composite score 50.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 221 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Little Rock data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Little Rock market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.4/100**

MW, all listings**150**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Little Rock at a glance

Little Rock has 150 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AVAIO Digital (150 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 150 |
| Total listed | 150 |

## Developers building or planning in Little Rock

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| AVAIO Digital | 150 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Little Rock

DC Hub does not hold a lease-rate figure for this market yet.

Little Rock's data center market comprises five tracked facilities across a fragmented operator base, with no recent deal activity on record. AVAIO Digital, Mainstream Technologies (operating under two entity names), and TierPoint (similarly split across two registered entities) each hold single-site positions in the market. The operator composition reflects minimal consolidation, with no dominant player and no clear signals of recent M&A reshaping the landscape.

This pairing suggests that new projects will face meaningful obstacles in securing grid interconnection, transmission upgrades, or power purchase agreements—even where generation capacity exists regionally.

The five-operator structure—each holding single facilities—suggests a market not yet dominated by portfolio-scale operators or roll-up activity. TierPoint's dual entity presence and Mainstream Technologies' similar split may reflect subsidiary structures or legacy naming rather than growth consolidation.

Forward momentum depends on resolution of local policy and transmission infrastructure, both of which remain in flux based on recent municipal deliberation around data center development.

## Data centers in Little Rock

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AVAIO Digital Leo (Little Rock Campus)](https://dchub.cloud/facilities/avaio-digital-avaio-digital-leo-little-rock-campus-d49fb688) | AVAIO Digital | Under Construction | 150 |
| [Mainstream Little Rock](https://dchub.cloud/facilities/mainstream-technologies-inc-mainstream-little-rock-6775b6a8) | Mainstream Technologies, Inc | Operational |  |
| [TIerPoint Little Rock](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-little-rock-0d871a02) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arkansas](https://dchub.cloud/facilities/in/us/arkansas).

## More on Little Rock

- [Little Rock DCPI score](https://dchub.cloud/dcpi/little-rock)
- [Little Rock market brief](https://dchub.cloud/markets/little-rock/brief)
- [Arkansas data center market brief](https://dchub.cloud/states/arkansas/brief)
- [Arkansas data center tax incentives](https://dchub.cloud/states/arkansas/data-center-incentives)

### Email me when the Little Rock DCPI verdict changes

Email me when Little Rock's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Little Rock: 150 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=little-rock) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=little-rock)

JSON: [/api/v1/markets/little-rock/deep-dive](https://dchub.cloud/api/v1/markets/little-rock/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Little Rock","item":"https://dchub.cloud/markets/little-rock"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Little Rock Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:07:35.459042+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/little-rock",
 "wordCount":221,
 "about":{"@type":"Place","name":"Little Rock"},
 "description":"Live data-center market analysis. DCPI score 50.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "little-rock", "name": "Little Rock Data Center Market — DC Hub", "description": "Live data-center market measurements for Little Rock, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/little-rock", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Little Rock"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 150.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:32."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:32.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:32."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/little-rock#webpage", "url": "https://dchub.cloud/markets/little-rock", "name": "Little Rock data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Little Rock data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Little Rock market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Little Rock data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Little Rock market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```