# Lithia Springs data center market

Power availability in Lithia Springs: DCPI verdict AVOID, composite score 22.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 232 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Lithia Springs data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Lithia Springs market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.4/100**

MW, all listings**215**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Lithia Springs at a glance

Lithia Springs has 215 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Switch (200 MW) and DataBank (15 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 215 |
| Total listed | 215 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Lithia Springs

DC Hub does not hold a lease-rate figure for this market yet.

Switch operates the largest footprint with three sites, while T5 Data Centers, Centersquare, and DataBank each maintain presence in the market. No recent deal activity has been tracked in this market.

Operator concentration and deal dormancy characterize the current landscape. Switch's three-site presence suggests established infrastructure dominance, while smaller operators including T5, Centersquare, and DataBank maintain more limited footprints. Regional context shows DataBank pursuing selective acquisitions elsewhere—the company acquired an Eagan data center facility—but no parallel activity has been recorded in Lithia Springs specifically.

Market participants should expect extended timelines for power availability confirmation before financial commitment to major new projects.

## Data centers in Lithia Springs

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Switch Atlanta Campus](https://dchub.cloud/facilities/switch-switch-atlanta-campus-b68858c9) | Switch | Operational | 200 |
| [DataBank ATL3](https://dchub.cloud/facilities/databank-databank-atl3-d78068b3) | DataBank | Operational | 15 |
| [Centersquare Atlanta (ATL1-A/B/C)](https://dchub.cloud/facilities/centersquare-centersquare-atlanta-atl1-abc-b0040e11) | Centersquare | Operational |  |
| [Digital Realty ATL (101 Aquila)](https://dchub.cloud/facilities/digital-realty-digital-realty-atl-101-aquila-5bd8642f) | Digital Realty | Operational |  |
| [Google Datacenter - Douglas County](https://dchub.cloud/facilities/google-google-datacenter-douglas-county-2dd022c4) | Google | Operational |  |
| [Switch Data Center](https://dchub.cloud/facilities/switch-switch-data-center-190083bd) | Switch | Operational |  |
| [T5@Atlanta](https://dchub.cloud/facilities/t5-data-centers-t5atlanta-c479bb91) | T5 Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Georgia](https://dchub.cloud/facilities/in/us/georgia).

## More on Lithia Springs

- [Lithia Springs DCPI score](https://dchub.cloud/dcpi/lithia-springs)
- [Lithia Springs market brief](https://dchub.cloud/markets/lithia-springs/brief)
- [Georgia data center market brief](https://dchub.cloud/states/georgia/brief)
- [Georgia data center tax incentives](https://dchub.cloud/states/georgia/data-center-incentives)

### Email me when the Lithia Springs DCPI verdict changes

Email me when Lithia Springs's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Lithia Springs: 215 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=lithia-springs) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=lithia-springs)

JSON: [/api/v1/markets/lithia-springs/deep-dive](https://dchub.cloud/api/v1/markets/lithia-springs/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Lithia Springs","item":"https://dchub.cloud/markets/lithia-springs"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Lithia Springs Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:07:28.465937+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/lithia-springs",
 "wordCount":232,
 "about":{"@type":"Place","name":"Lithia Springs"},
 "description":"Live data-center market analysis. DCPI score 22.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "lithia-springs", "name": "Lithia Springs Data Center Market — DC Hub", "description": "Live data-center market measurements for Lithia Springs, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/lithia-springs", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Lithia Springs"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 215.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:43."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:43.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:43."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/lithia-springs#webpage", "url": "https://dchub.cloud/markets/lithia-springs", "name": "Lithia Springs data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Lithia Springs data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Lithia Springs market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Lithia Springs data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Lithia Springs market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```