---
description: Is Linthicum Heights a good data center market for power? DCPI verdict AVOID, score 23.4/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Linthicum Heights data centers: power, grid and capacity | DC Hub"
---

# Linthicum Heights data center market

Power availability in Linthicum Heights: DCPI verdict AVOID, composite score 23.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 240 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Linthicum Heights data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Linthicum Heights market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**23.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Linthicum Heights

DC Hub does not hold a lease-rate figure for this market yet.

Linthicum Heights operates as a four-facility market dominated by TierPoint, with no reported capacity metrics available. The market hosts one TierPoint site, one facility under TierPoint Baltimore BWI branding, and operations attributed to both TierPoint, LLC and Tunbroker LLC. No recent transactions have been tracked in this market segment.

Operator concentration is pronounced. TierPoint maintains multiple registered positions across facility entries, establishing a clear market anchor, while Tunbroker LLC represents the only other tracked operator. This structure suggests a mature, consolidated market with limited new entrant activity.

## More on Linthicum Heights

- [Linthicum Heights DCPI score](https://dchub.cloud/dcpi/linthicum-heights)
- [Linthicum Heights market brief](https://dchub.cloud/markets/linthicum-heights/brief)
- [Maryland data center market brief](https://dchub.cloud/states/maryland/brief)
- [Maryland data center tax incentives](https://dchub.cloud/states/maryland/data-center-incentives)

### Email me when the Linthicum Heights DCPI verdict changes

Email me when Linthicum Heights's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Linthicum Heights market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=linthicum-heights) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=linthicum-heights)

JSON: [/api/v1/markets/linthicum-heights/deep-dive](https://dchub.cloud/api/v1/markets/linthicum-heights/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Linthicum Heights","item":"https://dchub.cloud/markets/linthicum-heights"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Linthicum Heights Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:07:13.558027+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/linthicum-heights",
 "wordCount":240,
 "about":{"@type":"Place","name":"Linthicum Heights"},
 "description":"Live data-center market analysis. DCPI score 23.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "linthicum-heights", "name": "Linthicum Heights Data Center Market — DC Hub", "description": "Live data-center market measurements for Linthicum Heights, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/linthicum-heights", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Linthicum Heights"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 23.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:29."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:29.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:29."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/linthicum-heights#webpage", "url": "https://dchub.cloud/markets/linthicum-heights", "name": "Linthicum Heights data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Linthicum Heights data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Linthicum Heights market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Linthicum Heights data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Linthicum Heights market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
