---
description: Is Lexington a good data center market for power? DCPI verdict AVOID, score 33.0/100 (SERC), as of 2026-11-12. 140 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Lexington data centers: power, grid and capacity | DC Hub"
---

# Lexington data center market

Power availability in Lexington: DCPI verdict AVOID, composite score 33 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 212 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Lexington data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Lexington market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**33.0/100**

MW, all listings**140**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Lexington

DC Hub does not hold a lease-rate figure for this market yet.

Lexington's tracked data center footprint totals 140 MW across three facilities operated by DartPoints, Lexington, and QX.Net. The market currently hosts a fragmented operator base with no single dominant player—each of the three tracked operators controls one facility. No recent deal activity has been recorded in this market.

This is the primary friction point for operators planning growth here—not demand uncertainty, but the mechanics of adding megawatts to the local supply chain.

Lexington's operator landscape remains atomized with no tracked M&A or lease activity in recent quarters. DartPoints operates one facility; the other two operators each control single sites. This structure contrasts with consolidated markets like Louisville, where a single operator manages multiple properties and achieves scale efficiencies.

## Data centers in Lexington

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [QX.Net Lexington](https://dchub.cloud/facilities/qxnet-qxnet-lexington-85b31e2c) | QX.Net | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Kentucky](https://dchub.cloud/facilities/in/us/kentucky).

## More on Lexington

- [Lexington DCPI score](https://dchub.cloud/dcpi/lexington-ky)
- [Lexington market brief](https://dchub.cloud/markets/lexington-ky/brief)
- [Kentucky data center market brief](https://dchub.cloud/states/kentucky/brief)
- [Kentucky data center tax incentives](https://dchub.cloud/states/kentucky/data-center-incentives)

### Email me when the Lexington DCPI verdict changes

Email me when Lexington's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Lexington: 140 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=lexington-ky) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=lexington-ky)

JSON: [/api/v1/markets/lexington-ky/deep-dive](https://dchub.cloud/api/v1/markets/lexington-ky/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Lexington Ky","item":"https://dchub.cloud/markets/lexington-ky"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Lexington Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:07:05.612456+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/lexington-ky",
 "wordCount":212,
 "about":{"@type":"Place","name":"Lexington"},
 "description":"Live data-center market analysis. DCPI score 33.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "lexington-ky", "name": "Lexington Data Center Market — DC Hub", "description": "Live data-center market measurements for Lexington, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/lexington-ky", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Lexington"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 140.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 33.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:30."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:30.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:30."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/lexington-ky#webpage", "url": "https://dchub.cloud/markets/lexington-ky", "name": "Lexington data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Lexington data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Lexington market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Lexington data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Lexington market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
