description: Is Lenoir a good data center market for power? DCPI verdict AVOID, score 31.3/100 (SERC), as of 2026-11-12. 200 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Lenoir data centers: power, grid and capacity | DC Hub"
---

# Lenoir data center market

Power availability in Lenoir: DCPI verdict AVOID, composite score 31.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Lenoir data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Lenoir market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**31.3/100**

MW, all listings**200**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Lenoir at a glance

Lenoir has 200 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (200 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 200 |
| Total listed | 200 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Lenoir

DC Hub does not hold a lease-rate figure for this market yet.

Lenoir hosts four tracked facilities across two major operators and one smaller player, with limited public capacity reporting. Google operates two sites in the market, while Centrilogic and Dacentec each operate one. Only one facility reports megawatt figures to DC Hub's tracking system, making aggregate footprint assessment impossible. No recent deal activity has been recorded in Lenoir.

The DCPI verdict of AVOID reflects acute supply-side friction. Together, these scores suggest that securing new power supplies—whether through utility interconnection, direct purchase agreements, or generator installation—faces material headwinds relative to other markets.

Operator concentration remains modest. Google's presence across two sites establishes it as the leading incumbent, but the participation of regional and smaller players (Centrilogic, Dacentec) indicates a fragmented competitive landscape rather than monopolistic control. The absence of tracked acquisition or sale activity over the review period reflects dormancy in deal flow; no transactions have been announced or recorded that would signal capital redeployment, consolidation, or entry by new operators into Lenoir.

## Data centers in Lenoir

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Google Lenoir Data Center](https://dchub.cloud/facilities/google-google-lenoir-data-center-d95a5f42) | Google | Operational | 200 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [North Carolina](https://dchub.cloud/facilities/in/us/north-carolina).

## More on Lenoir

- [Lenoir DCPI score](https://dchub.cloud/dcpi/lenoir)
- [Lenoir market brief](https://dchub.cloud/markets/lenoir/brief)
- [North Carolina data center market brief](https://dchub.cloud/states/north-carolina/brief)
- [North Carolina data center tax incentives](https://dchub.cloud/states/north-carolina/data-center-incentives)

### Email me when the Lenoir DCPI verdict changes

Email me when Lenoir's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Lenoir: 200 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=lenoir) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=lenoir)

JSON: [/api/v1/markets/lenoir/deep-dive](https://dchub.cloud/api/v1/markets/lenoir/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Lenoir","item":"https://dchub.cloud/markets/lenoir"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Lenoir Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:55:26.807088+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/lenoir",
 "wordCount":231,
 "about":{"@type":"Place","name":"Lenoir"},
 "description":"Live data-center market analysis. DCPI score 31.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "lenoir", "name": "Lenoir Data Center Market — DC Hub", "description": "Live data-center market measurements for Lenoir, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/lenoir", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Lenoir"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 200.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 31.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:25."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:25.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:25."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/lenoir#webpage", "url": "https://dchub.cloud/markets/lenoir", "name": "Lenoir data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Lenoir data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Lenoir market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Lenoir data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Lenoir market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```