description: Is Leesburg a good data center market for power? DCPI verdict AVOID, score 20.8/100 (PJM), as of 2026-11-12. 205 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Leesburg data centers: power, grid and capacity | DC Hub"
---

# Leesburg data center market

Power availability in Leesburg: DCPI verdict AVOID, composite score 20.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 257 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Leesburg data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Leesburg market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.8/100**

MW, all listings**205**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Leesburg at a glance

Leesburg has 105 MW operational and 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are STACK Infrastructure (100 MW), Google (80 MW) and True North Data Solutions (25 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 105 |
| Under construction | 100 |
| Total listed | 205 |

## Developers building or planning in Leesburg

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| STACK Infrastructure | 100 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Leesburg

DC Hub does not hold a lease-rate figure for this market yet.

True North Data Solutions operates the largest footprint with six facilities, while Amazon Web Services and Google each maintain three sites in the market. The operator base remains concentrated: these three entities account for 12 of the 48 tracked sites, leaving substantial capacity distributed among smaller players and unverified listings.

These readings suggest that new power availability will be a primary friction point for any facility requiring incremental supply beyond existing contractual commitments.

Deal flow remains sparse. Regional headlines confirm ongoing demand for data center land in Virginia, though a contemporaneous push for a state moratorium on new data center development reflects political pressure in Loudoun County, where Leesburg is located. Operator positioning shows no evidence of portfolio shifts; the six-to-three distribution of facilities among the top three operators remains stable in available data.

Power scarcity will likely shape facility economics and timeline expectations for any new or expanded deployments in Leesburg over the coming cycle.

## Data centers in Leesburg

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [STACK NVA06 Leesburg](https://dchub.cloud/facilities/stack-infrastructure-stack-nva06-leesburg-a1ad08c1) | STACK Infrastructure | Under Construction | 100 |
| [Google Data Center](https://dchub.cloud/facilities/google-google-data-center-0cd3c69b) | Google | Operational | 80 |
| [42254 THUNDERBALL DR](https://dchub.cloud/facilities/true-north-data-solutions-42254-thunderball-dr-798548db) | True North Data Solutions | Operational | 5 |
| [42255 THUNDERBALL DR](https://dchub.cloud/facilities/true-north-data-solutions-42255-thunderball-dr-5abfbdd1) | True North Data Solutions | Operational | 5 |
| [42310 THUNDERBALL DR](https://dchub.cloud/facilities/true-north-data-solutions-42310-thunderball-dr-41c5a084) | True North Data Solutions | Operational | 5 |
| [42311 THUNDERBALL DR](https://dchub.cloud/facilities/true-north-data-solutions-42311-thunderball-dr-5a259578) | True North Data Solutions | Operational | 5 |
| [TikTok Data Center](https://dchub.cloud/facilities/true-north-data-solutions-tiktok-data-center-a97205b5) | True North Data Solutions | Operational | 5 |
| [STACK INFRASTRUCTURE - SI NVA06A LLC](https://dchub.cloud/facilities/stack-infrastructure-si-nva06a-llc-aded5737) | STACK Infrastructure |  |  |
| [Stonewall Creek Business Park](https://dchub.cloud/facilities/google-stonewall-creek-business-park-2e6be579) | Google | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Leesburg

- [Leesburg DCPI score](https://dchub.cloud/dcpi/leesburg)
- [Leesburg market brief](https://dchub.cloud/markets/leesburg/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Leesburg DCPI verdict changes

Email me when Leesburg's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Leesburg: 205 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=leesburg) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=leesburg)

JSON: [/api/v1/markets/leesburg/deep-dive](https://dchub.cloud/api/v1/markets/leesburg/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Leesburg","item":"https://dchub.cloud/markets/leesburg"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Leesburg Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:06:27.801457+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/leesburg",
 "wordCount":257,
 "about":{"@type":"Place","name":"Leesburg"},
 "description":"Live data-center market analysis. DCPI score 20.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "leesburg", "name": "Leesburg Data Center Market — DC Hub", "description": "Live data-center market measurements for Leesburg, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/leesburg", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Leesburg"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 205.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:49."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:49.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:49."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/leesburg#webpage", "url": "https://dchub.cloud/markets/leesburg", "name": "Leesburg data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Leesburg data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Leesburg market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Leesburg data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Leesburg market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```