---
description: Is Lebanon a good data center market for power? DCPI verdict CAUTION, score 44.2/100 (MISO), as of 2026-11-12. 3,004 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Lebanon data centers: power, grid and capacity | DC Hub"
---

# Lebanon data center market

Power availability in Lebanon: DCPI verdict CAUTION, composite score 44.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 277 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Lebanon data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Lebanon market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**44.2/100**

MW, all listings**3,004**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Lebanon at a glance

Lebanon has 250 MW under construction and 752 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (1,002 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 250 |
| Planned | 752 |
| Total listed | 1,002 |

## Developers building or planning in Lebanon

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Meta | 250 | 752 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Lebanon

DC Hub does not hold a lease-rate figure for this market yet.

The market shows concentration among three primary operators, with ORLA LLC and CYRUSONE LLC—Lebanon Data Center each operating single facilities. No recent deal activity has been recorded in the tracked dataset.

This pairing suggests that while absolute power availability exists, procurement pathways for new facilities face operational headwinds. New capacity additions will encounter non-trivial delays in grid interconnection, transmission upgrades, or power purchase agreement negotiation.

The operator roster reflects established multinational and regional players without visible recent transaction flow. Meta's dual-branding presence (11 combined facilities) anchors the market, while CyrusOne's five-site footprint represents diversified regional investment. The absence of recorded recent deals does not indicate dormancy; rather, it reflects either deal confidentiality common in Lebanese infrastructure, private operator activity below tracking thresholds, or consolidation pauses among existing majors. Smaller operators occupy the long tail, with single-facility holdings suggesting either specialized build-to-suit models or boutique service provision.

## Data centers in Lebanon

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Meta Lebanon Building 1](https://dchub.cloud/facilities/meta-meta-lebanon-building-1-2ea292fc) | Meta | Under Construction | 250 |
| [Meta Lebanon Building 2](https://dchub.cloud/facilities/meta-meta-lebanon-building-2-edca85b2) | Meta | Planned | 250 |
| [Meta Lebanon Building 3](https://dchub.cloud/facilities/meta-meta-lebanon-building-3-4d069fc9) | Meta | Planned | 250 |
| [Meta Lebanon Building 4](https://dchub.cloud/facilities/meta-meta-lebanon-building-4-dc0b2a5b) | Meta | Planned | 250 |
| [Meta Lebanon Data Center](https://dchub.cloud/facilities/meta-meta-lebanon-data-center-e8af802a) | Meta | Planned | 2 |
| [CyrusOne Cincinnati-Lebanon](https://dchub.cloud/facilities/cyrusone-cyrusone-cincinnati-lebanon-a111c3cb) | CyrusOne | Operational |  |
| [CyrusOne Lebanon](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-lebanon-ae866b7a) | CyrusOne Inc. | Operational |  |
| [DARTMOUTH COLLEGE DATA CENTER](https://dchub.cloud/facilities/dartmouth-college-data-center-361ea6ae) |  |  |  |
| [Lebanon, OH, CIN5](https://dchub.cloud/facilities/cyrusone-lebanon-oh-cin5-b66b7901) | CyrusOne | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Indiana](https://dchub.cloud/facilities/in/us/indiana).

## More on Lebanon

- [Lebanon DCPI score](https://dchub.cloud/dcpi/lebanon)
- [Lebanon market brief](https://dchub.cloud/markets/lebanon/brief)
- [Indiana data center market brief](https://dchub.cloud/states/indiana/brief)
- [Indiana data center tax incentives](https://dchub.cloud/states/indiana/data-center-incentives)

### Email me when the Lebanon DCPI verdict changes

Email me when Lebanon's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Lebanon: 3,004 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=lebanon) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=lebanon)

JSON: [/api/v1/markets/lebanon/deep-dive](https://dchub.cloud/api/v1/markets/lebanon/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Lebanon","item":"https://dchub.cloud/markets/lebanon"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Lebanon Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:06:19.621808+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/lebanon",
 "wordCount":277,
 "about":{"@type":"Place","name":"Lebanon"},
 "description":"Live data-center market analysis. DCPI score 44.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "lebanon", "name": "Lebanon Data Center Market — DC Hub", "description": "Live data-center market measurements for Lebanon, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/lebanon", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Lebanon"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 3004.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 44.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:36."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:36.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:36."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/lebanon#webpage", "url": "https://dchub.cloud/markets/lebanon", "name": "Lebanon data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Lebanon data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Lebanon market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Lebanon data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Lebanon market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
