# Laurel data center market

Power availability in Laurel: DCPI verdict AVOID, composite score 23.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 213 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Laurel data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Laurel market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**23.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Laurel

DC Hub does not hold a lease-rate figure for this market yet.

Laurel's tracked data center footprint comprises three facilities, with AiNET operating one site in the market. Beyond this single operator presence, the market shows minimal documentation of active facility portfolios or recent transaction activity.

Deal flow in Laurel remains dormant. No recent transactions have been tracked in the market, leaving operator dynamics opaque. The single tracked operator, AiNET, provides insufficient data to characterize competitive positioning, investment appetite, or capacity deployment patterns. Without deal activity, M&A and capacity expansion plans remain unknown.

Power availability friction in Laurel will likely persist unless grid reinforcement occurs at the distribution or transmission level. Prospective operators should verify current interconnection queue status and utility upgrade timelines before committing capital to site selection or lease negotiations.

## Data centers in Laurel

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AiNET WDC11](https://dchub.cloud/facilities/ainet-ainet-wdc11-db742260) | AiNET | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Maryland](https://dchub.cloud/facilities/in/us/maryland).

## More on Laurel

- [Laurel DCPI score](https://dchub.cloud/dcpi/laurel)
- [Laurel market brief](https://dchub.cloud/markets/laurel/brief)
- [Maryland data center market brief](https://dchub.cloud/states/maryland/brief)
- [Maryland data center tax incentives](https://dchub.cloud/states/maryland/data-center-incentives)

### Email me when the Laurel DCPI verdict changes

Email me when Laurel's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Laurel market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=laurel) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=laurel)

JSON: [/api/v1/markets/laurel/deep-dive](https://dchub.cloud/api/v1/markets/laurel/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Laurel","item":"https://dchub.cloud/markets/laurel"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Laurel Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:55:33.777306+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/laurel",
 "wordCount":213,
 "about":{"@type":"Place","name":"Laurel"},
 "description":"Live data-center market analysis. DCPI score 23.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "laurel", "name": "Laurel Data Center Market — DC Hub", "description": "Live data-center market measurements for Laurel, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/laurel", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Laurel"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 23.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:20."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:20.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:20."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/laurel#webpage", "url": "https://dchub.cloud/markets/laurel", "name": "Laurel data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Laurel data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Laurel market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Laurel data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Laurel market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```