---
description: Is Las Vegas a good data center market for power? DCPI verdict CAUTION, score 48.4/100 (WECC), as of 2026-11-12. 560 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Las Vegas data centers: power, grid and capacity | DC Hub"
---

# Las Vegas data center market

Power availability in Las Vegas: DCPI verdict CAUTION, composite score 48.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 259 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Las Vegas data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Las Vegas market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.4/100**

MW, all listings**560**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Las Vegas at a glance

Las Vegas has 280 MW operational, 100 MW under construction and 50 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Switch (250 MW), Novva Data Centers (100 MW) and Jet.AI / CCE (50 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 280 |
| Under construction | 100 |
| Planned | 50 |
| Total listed | 430 |

## Developers building or planning in Las Vegas

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Novva Data Centers | 100 |  |
| Jet.AI / CCE |  | 50 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Las Vegas

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Anchored on JLL North America Data Center Report Midyear 2025 (1-5 MW, H1 2025): Las Vegas/Reno combined (figure on paid plans); Las Vegas carries a slight premium over Reno.

Switch operates the largest footprint with 12 tracked sites, followed by Flexential and its affiliated entity with 9 combined facilities. CenturyLink Las Vegas maintains 2 tracked locations. The tracked portfolio spans operational, under-construction, and planned assets, reflecting ongoing infrastructure expansion in the region.

This combination signals mixed conditions for new power procurement. New entrants and existing operators expanding here face neither acute scarcity nor abundant slack—power availability requires active management but does not present acute barriers to new project development.

No recent deals are currently tracked in the Las Vegas market, leaving deal flow visibility limited. The operator landscape remains dominated by Switch's significant presence alongside Flexential's multi-property footprint. Regional expansion activity has been documented in news coverage, with Switch publicly discussing plans for new data center builds in the Las Vegas Valley and city officials reviewing expansion approvals. Regulatory activity has also intensified, with Nye County implementing new development rules for potential data center projects, indicating heightened policy attention to the sector's growth trajectory in adjacent jurisdictions.

Grid infrastructure evolution and regulatory clarity around future capacity will shape power availability for the next generation of Las Vegas data center projects.

## Data centers in Las Vegas

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Switch SuperNAP](https://dchub.cloud/facilities/switch-switch-supernap-222ac47b) | Switch | Operational | 250 |
| [Novva North Las Vegas (Apex)](https://dchub.cloud/facilities/novva-data-centers-novva-north-las-vegas-apex-51c32fce) | Novva Data Centers | Under Construction | 100 |
| [Jet.AI & CCE JV Clark County](https://dchub.cloud/facilities/jetai-cce-jetai-cce-jv-clark-county-ccbaf971) | Jet.AI / CCE | Planned | 50 |
| [Equinix LV1](https://dchub.cloud/facilities/equinix-equinix-lv1-77455540) | Equinix | Operational | 30 |
| [CoreWeave LAS1 (Las Vegas)](https://dchub.cloud/facilities/coreweave-coreweave-las1-las-vegas-836a9640) | CoreWeave | Operational |  |
| [EdgeConneX Las Vegas (EDCLAS01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-las-vegas-edclas01-ca90c0b7) | EdgeConneX Inc. | Operational |  |
| [EdgeConneX Las Vegas NV](https://dchub.cloud/facilities/edgeconnex-edgeconnex-las-vegas-nv-54db0070) | EdgeConneX | Operational |  |
| [Fiberhub LAS1](https://dchub.cloud/facilities/fiberhub-fiberhub-las1-d1ef17b3) | Fiberhub | Operational |  |
| [Flexential - Las Vegas/Downtown (LAS03)](https://dchub.cloud/facilities/flexential-corp-flexential-las-vegasdowntown-las03-665a47f2) | Flexential Corp. | Operational |  |
| [Flexential Las Vegas - Downtown](https://dchub.cloud/facilities/flexential-flexential-las-vegas-downtown-6e349ba4) | Flexential | Operational |  |
| [Flexential Las Vegas - North](https://dchub.cloud/facilities/flexential-flexential-las-vegas-north-ce1c7a2f) | Flexential | Operational |  |
| [Switch LAS VEGAS SuperNAP 7](https://dchub.cloud/facilities/switch-switch-las-vegas-supernap-7-b506b900) | Switch | Operational |  |
| [Switch Las Vegas](https://dchub.cloud/facilities/switch-ltd-switch-las-vegas-33e5d9b4) | Switch, Ltd. | Operational |  |
| [Switch Las Vegas 11](https://dchub.cloud/facilities/switch-switch-las-vegas-11-969b4e4f) | Switch | Operational |  |
| [Switch Las Vegas 14](https://dchub.cloud/facilities/switch-switch-las-vegas-14-89b1c27b) | Switch | Operational |  |
| [Switch Las Vegas 4](https://dchub.cloud/facilities/switch-switch-las-vegas-4-68d0ff15) | Switch | Operational |  |
| [Switch Las Vegas 5](https://dchub.cloud/facilities/switch-switch-las-vegas-5-6b5a896a) | Switch | Operational |  |
| [Switch Las Vegas 7](https://dchub.cloud/facilities/switch-switch-las-vegas-7-f3ed2b71) | Switch | Operational |  |
| [Switch Las Vegas 8](https://dchub.cloud/facilities/switch-switch-las-vegas-8-1630bb5d) | Switch | Operational |  |
| [Switch Las Vegas 9](https://dchub.cloud/facilities/switch-switch-las-vegas-9-040d3ff0) | Switch | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Nevada](https://dchub.cloud/facilities/in/us/nevada).

## More on Las Vegas

- [Las Vegas DCPI score](https://dchub.cloud/dcpi/las-vegas)
- [Las Vegas market brief](https://dchub.cloud/markets/las-vegas/brief)
- [Nevada data center market brief](https://dchub.cloud/states/nevada/brief)
- [Nevada data center tax incentives](https://dchub.cloud/states/nevada/data-center-incentives)

### Email me when the Las Vegas DCPI verdict changes

Email me when Las Vegas's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Las Vegas: 560 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=las-vegas) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=las-vegas)

JSON: [/api/v1/markets/las-vegas/deep-dive](https://dchub.cloud/api/v1/markets/las-vegas/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Las Vegas","item":"https://dchub.cloud/markets/las-vegas"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Las Vegas Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:06:11.494206+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/las-vegas",
 "wordCount":259,
 "about":{"@type":"Place","name":"Las Vegas"},
 "description":"Live data-center market analysis. DCPI score 48.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "las-vegas", "name": "Las Vegas Data Center Market — DC Hub", "description": "Live data-center market measurements for Las Vegas, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/las-vegas", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Las Vegas"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 560.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:35."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:35.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:35."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/las-vegas#webpage", "url": "https://dchub.cloud/markets/las-vegas", "name": "Las Vegas data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Las Vegas data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Las Vegas market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Las Vegas data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Las Vegas market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
