---
description: Is Lakeland a good data center market for power? DCPI verdict AVOID, score 32.1/100 (FRCC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Lakeland data centers: power, grid and capacity | DC Hub"
---

# Lakeland data center market

Power availability in Lakeland: DCPI verdict AVOID, composite score 32.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 297 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Lakeland data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Lakeland market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Lakeland

DC Hub does not hold a lease-rate figure for this market yet.

Lakeland's tracked data center footprint comprises three facilities operated by Cologix and Lawton Information Services, LLC. The market shows minimal recent transaction activity, with no deals recorded in the tracking period. This combination—moderate surplus paired with moderate accessibility barriers—creates a bifurcated supply picture.

In Lakeland's case, operators and developers pursuing new power allocations will face procurement costs and timeline unpredictability above regional baselines.

The operator base is narrow and static. Cologix operates two of the three tracked sites, while Lawton Information Services, LLC operates one. The absence of recent deal flow—acquisitions, leases, or new builds—suggests limited M&A or greenfield activity in the period under review. This does not indicate market weakness; it reflects a market segment that is neither attracting consolidation capital nor generating exit events at a detectable scale. Nearby Florida markets such as Jacksonville and Miami have seen larger discrete transactions, but Lakeland's three-facility tracker does not show comparable momentum.

## Data centers in Lakeland

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cologix LAK1](https://dchub.cloud/facilities/cologix-inc-cologix-lak1-c3d7fabd) | Cologix, Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Florida](https://dchub.cloud/facilities/in/us/florida).

## More on Lakeland

- [Lakeland DCPI score](https://dchub.cloud/dcpi/lakeland)
- [Lakeland market brief](https://dchub.cloud/markets/lakeland/brief)
- [Florida data center market brief](https://dchub.cloud/states/florida/brief)
- [Florida data center tax incentives](https://dchub.cloud/states/florida/data-center-incentives)

### Email me when the Lakeland DCPI verdict changes

Email me when Lakeland's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Lakeland market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=lakeland) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=lakeland)

JSON: [/api/v1/markets/lakeland/deep-dive](https://dchub.cloud/api/v1/markets/lakeland/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Lakeland","item":"https://dchub.cloud/markets/lakeland"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Lakeland Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:05:55.999467+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/lakeland",
 "wordCount":297,
 "about":{"@type":"Place","name":"Lakeland"},
 "description":"Live data-center market analysis. DCPI score 32.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "lakeland", "name": "Lakeland Data Center Market — DC Hub", "description": "Live data-center market measurements for Lakeland, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/lakeland", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Lakeland"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:48."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:48.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:48."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/lakeland#webpage", "url": "https://dchub.cloud/markets/lakeland", "name": "Lakeland data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Lakeland data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Lakeland market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Lakeland data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Lakeland market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
