description: Is La Vista a good data center market for power? DCPI verdict BUILD, score 68.0/100 (SPP), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "La Vista data centers: power, grid and capacity | DC Hub"
---

# La Vista data center market

Power availability in La Vista: DCPI verdict BUILD, composite score 68 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 243 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the La Vista data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the La Vista market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**68.0/100**

MW, all listings**0**any status, unverified listings included

Verdict**BUILD**

## Colocation lease rates in La Vista

DC Hub does not hold a lease-rate figure for this market yet.

La Vista's power supply environment is favorable for new builds, with six tracked facilities anchored by hyperscale and institutional operators. Meta operates two sites in the market, while Fidelity, H5 Data Centers, Travelers Insurance, and Yahoo each maintain single facilities. The market has not recorded recent deal activity in the tracked dataset.

Deal flow in La Vista remains quiet in the tracked record, with no recent transactions recorded. The operator base reflects a mixed profile: two hyperscale entrants (Meta), one major financial services tenant (Fidelity), and three smaller or specialized operators. The absence of recent deal announcements does not signal market weakness on power grounds; it reflects the market's current state as a build-ready environment rather than an active M&A or acquisition zone.

Forward momentum will depend on whether new capacity deployment in La Vista continues to align with the favorable power conditions the DCPI metrics currently reflect.

## Data centers in La Vista

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Fidelity](https://dchub.cloud/facilities/fidelity-fidelity-4c48e361) |  | Operational |  |
| [H5 Data Centers Omaha](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-omaha-973a2b6a) | H5 Data Centers | Operational |  |
| [Meta Sarpy Data center](https://dchub.cloud/facilities/meta-meta-sarpy-data-center-95d8688e) | Meta | Operational |  |
| [Sarpy Meta Data Center](https://dchub.cloud/facilities/meta-sarpy-meta-data-center-61a46d9c) | Meta | Operational |  |
| [Travelers Insurance](https://dchub.cloud/facilities/travelers-insurance-travelers-insurance-abde997f) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Nebraska](https://dchub.cloud/facilities/in/us/nebraska).

## More on La Vista

- [La Vista DCPI score](https://dchub.cloud/dcpi/la-vista)
- [La Vista market brief](https://dchub.cloud/markets/la-vista/brief)
- [Nebraska data center market brief](https://dchub.cloud/states/nebraska/brief)
- [Nebraska data center tax incentives](https://dchub.cloud/states/nebraska/data-center-incentives)

### Email me when the La Vista DCPI verdict changes

Email me when La Vista's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

La Vista market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=la-vista) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=la-vista)

JSON: [/api/v1/markets/la-vista/deep-dive](https://dchub.cloud/api/v1/markets/la-vista/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"La Vista","item":"https://dchub.cloud/markets/la-vista"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"La Vista Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:05:39.878827+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/la-vista",
 "wordCount":243,
 "about":{"@type":"Place","name":"La Vista"},
 "description":"Live data-center market analysis. DCPI score 68.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "la-vista", "name": "La Vista Data Center Market — DC Hub", "description": "Live data-center market measurements for La Vista, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/la-vista", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "La Vista"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 68.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:28."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:28.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:28."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/la-vista#webpage", "url": "https://dchub.cloud/markets/la-vista", "name": "La Vista data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the La Vista data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the La Vista market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the La Vista data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the La Vista market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```