# Knoxville data center market

Power availability in Knoxville: DCPI verdict AVOID, composite score 30.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Knoxville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Knoxville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**30.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Knoxville

DC Hub does not hold a lease-rate figure for this market yet.

Knoxville's tracked data center footprint comprises seven facilities operated by a fragmented vendor base led by Verizon with two sites, followed by Peace Communications, Sh Data Technologies, and Vital Records Control each holding one facility. No tracked operator in this market has reported megawattage to DC Hub, making aggregate capacity assessment impossible from available data. The operator roster reflects regional and mid-market participation rather than hyperscale or national infrastructure players, with no single entity controlling material market share.

Together these scores suggest that grid access and power sourcing costs would face headwinds for any facility seeking to add significant demand to the Knoxville market. The regional utility environment—shaped by TVA's generation mix and transmission topology—remains the binding variable for new supply-side projects.

Deal flow in Knoxville has been dormant; no recent transactions have been tracked in this market. The operator base shows no recent consolidation, strategic repositioning, or capital-led expansion activity.

## Data centers in Knoxville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Peace Communications KNX1](https://dchub.cloud/facilities/peace-communications-formerly-nexus-group-peace-communications-knx1-247517ff) | Peace Communications (Formerly Nexus Group) | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Tennessee](https://dchub.cloud/facilities/in/us/tennessee).

## More on Knoxville

- [Knoxville DCPI score](https://dchub.cloud/dcpi/knoxville)
- [Knoxville market brief](https://dchub.cloud/markets/knoxville/brief)
- [Tennessee data center market brief](https://dchub.cloud/states/tennessee/brief)
- [Tennessee data center tax incentives](https://dchub.cloud/states/tennessee/data-center-incentives)

### Email me when the Knoxville DCPI verdict changes

Email me when Knoxville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Knoxville market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=knoxville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=knoxville)

JSON: [/api/v1/markets/knoxville/deep-dive](https://dchub.cloud/api/v1/markets/knoxville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Knoxville","item":"https://dchub.cloud/markets/knoxville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Knoxville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:05:32.263996+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/knoxville",
 "wordCount":231,
 "about":{"@type":"Place","name":"Knoxville"},
 "description":"Live data-center market analysis. DCPI score 30.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "knoxville", "name": "Knoxville Data Center Market — DC Hub", "description": "Live data-center market measurements for Knoxville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/knoxville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Knoxville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 30.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:29."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:29.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:29."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/knoxville#webpage", "url": "https://dchub.cloud/markets/knoxville", "name": "Knoxville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Knoxville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Knoxville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Knoxville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Knoxville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```